Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Roasted coffee
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OD0142 #04 Y:1999 Pay bills on time to avoid late fees $1,270 -
OD0142 #03 Y:1999 Reduce space conditioning during non-working hours $1,104 $130
OD0142 #02 Y:1999 Reduce the pressure of compressed air to the minimum required $159 $20
OD0142 #01 Y:1999 Utilize higher efficiency lamps and/or ballasts $4,924 $25,775
OK0575 #08 Y:1999 Install automatic packing equipment $22,815 $35,000
OK0575 #07 Y:1999 Install automatic packing equipment $15,210 $22,500
OK0575 #06 Y:1999 Utilize energy-efficient belts and other improved mechanisms $495 $273
OK0575 #05 Y:1999 Use most efficient type of electric motors $307 $210
OK0575 #04 Y:1999 Utilize higher efficiency lamps and/or ballasts $243 $417
OK0575 #03 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $616 $400
OK0575 #02 Y:1999 Install spectral reflectors / delamp $2,531 $1,764
OK0575 #01 Y:1999 Pay bills on time to avoid late fees $306 -
UL0166 #02 Y:1996 Recover and reuse waste material $668 -
UL0166 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $662 $1,909
AM0267 #05 Y:1996 Recover and reuse cooling water $6,110 $4,380
AM0267 #04 Y:1996 Meter waste water $9,790 $2,200
AM0267 #03 Y:1996 Utilize controls to operate equipment only when needed $2,040 $2,500
AM0267 #02 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $2,640 $1,000
AM0267 #01 Y:1996 Optimize plant power factor $27,300 $65,100
OK0481 #07 Y:1995 Insulate bare equipment $77 $31