ITAC Assessment: OD0142
ITAC logo
ITAC Assessment: OD0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Roasted Coffee
NAICS
n/a
SIC 2095: Roasted Coffee
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 31,000
ft2
Annual Production 4,500,000
lb
Production Hrs. Annual 2,654
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,016 805,100
kWh
Electricity Demand $14,156 2,556
kW-mo/yr
Electricity Fees $7,052 -
Natural Gas $37,280 5,351
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,924 $25,775 $3,188
69,461
kWh
$1,736
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $159 $20 $159
3,517
kWh
- - -
03 2.7224: Reduce space conditioning during non-working hours $1,104 $130 $168
3,517
kWh
- $936
-
MMBtu
-
04 4.821: Pay bills on time to avoid late fees $1,270 - - - - $1,270
TOTAL RECOMMENDED $7,457 $25,925 $3,515
76,495
kWh
$1,736
-
kW-mo/yr
$936
-
MMBtu
$1,270
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs