Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Roasted coffee
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0362 #05 Y:2005 Use most efficient type of electric motors $245 $324
UF0362 #04 Y:2005 Utilize energy-efficient belts and other improved mechanisms $767 -
UF0362 #03 Y:2005 Lower temperature during the winter season and vice-versa $14,498 -
UF0362 #02 Y:2005 Install occupancy sensors $5,310 $2,525
UF0362 #01 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $11,108 $706
LL0180 #09 Y:2003 Utilize higher efficiency lamps and/or ballasts $200 $140
LL0180 #08 Y:2003 Install occupancy sensors $374 $180
LL0180 #07 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $1,160 $195
LL0180 #06 Y:2003 Utilize higher efficiency lamps and/or ballasts $1,325 $7,520
LL0180 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $1,933 $15
LL0180 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $2,131 $2,120
LL0180 #03 Y:2003 Reduce illumination to minimum necessary levels $2,329 $430
LL0180 #02 Y:2003 Insulate bare equipment $3,304 $2,261
LL0180 #01 Y:2003 Install occupancy sensors $5,529 $100
KU0539 #06 Y:2000 Replace purchased steam with other energy source $77,640 $85,000
KU0539 #05 Y:2000 Use closed cycle process to minimize waste water production $9,070 $5,750
KU0539 #04 Y:2000 Reschedule plant operations or reduce load to avoid peaks $2,800 -
KU0539 #03 Y:2000 Use optimum temperature $15,700 $20,000
KU0539 #02 Y:2000 Recover waste heat from equipment $44,700 $30,000
KU0539 #01 Y:2000 Recover waste heat from equipment $163,360 $135,000