208
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Roasted coffee | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0362 #05 Y:2005 | 05 | 2005 | Use most efficient type of electric motors | $245 | $324 | |
| UF0362 #04 Y:2005 | 04 | 2005 | Utilize energy-efficient belts and other improved mechanisms | $767 | - | |
| UF0362 #03 Y:2005 | 03 | 2005 | Lower temperature during the winter season and vice-versa | $14,498 | - | |
| UF0362 #02 Y:2005 | 02 | 2005 | Install occupancy sensors | $5,310 | $2,525 | |
| UF0362 #01 Y:2005 | 01 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,108 | $706 | |
| LL0180 #09 Y:2003 | 09 | 2003 | Utilize higher efficiency lamps and/or ballasts | $200 | $140 | |
| LL0180 #08 Y:2003 | 08 | 2003 | Install occupancy sensors | $374 | $180 | |
| LL0180 #07 Y:2003 | 07 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,160 | $195 | |
| LL0180 #06 Y:2003 | 06 | 2003 | Utilize higher efficiency lamps and/or ballasts | $1,325 | $7,520 | |
| LL0180 #05 Y:2003 | 05 | 2003 | Reduce the pressure of compressed air to the minimum required | $1,933 | $15 | |
| LL0180 #04 Y:2003 | 04 | 2003 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,131 | $2,120 | |
| LL0180 #03 Y:2003 | 03 | 2003 | Reduce illumination to minimum necessary levels | $2,329 | $430 | |
| LL0180 #02 Y:2003 | 02 | 2003 | Insulate bare equipment | $3,304 | $2,261 | |
| LL0180 #01 Y:2003 | 01 | 2003 | Install occupancy sensors | $5,529 | $100 | |
| KU0539 #06 Y:2000 | 06 | 2000 | Replace purchased steam with other energy source | $77,640 | $85,000 | |
| KU0539 #05 Y:2000 | 05 | 2000 | Use closed cycle process to minimize waste water production | $9,070 | $5,750 | |
| KU0539 #04 Y:2000 | 04 | 2000 | Reschedule plant operations or reduce load to avoid peaks | $2,800 | - | |
| KU0539 #03 Y:2000 | 03 | 2000 | Use optimum temperature | $15,700 | $20,000 | |
| KU0539 #02 Y:2000 | 02 | 2000 | Recover waste heat from equipment | $44,700 | $30,000 | |
| KU0539 #01 Y:2000 | 01 | 2000 | Recover waste heat from equipment | $163,360 | $135,000 |