| Assessment Year | 2000 |
|---|---|
| Principal Product | coffee |
| NAICS |
n/a
|
| SIC | 2095: Roasted Coffee |
| Sales Range | $100 M to 500M |
| # of Employees | 235 |
| Plant Area |
150,000
ft2
|
| Annual Production | 100,000,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $489,342 | 13,619,871 |
kWh
|
$0.036 |
| Electricity Demand | $227,526 | 26,976 |
kW-mo/yr
|
$8.43 |
| Natural Gas | $703,564 | 232,065 |
MMBtu
|
$3.03 |
| Other Energy | $125,455 | 9,658 |
MMBtu
|
$12.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $313,270 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,700 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $163,360 | $135,000 | - | - |
$163,360
-
MMBtu
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $44,700 | $30,000 | - | - |
$44,700
-
MMBtu
|
- | - | - | |
| 03 | 2.2211: Use optimum temperature | $15,700 | $20,000 | - | - |
$15,700
-
MMBtu
|
- | - | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,800 | - | - |
$6,800
-
kW-mo/yr
|
- | - | - | $(-4,000.0) | |
| 05 | 3.4111: Use closed cycle process to minimize waste water production | $9,070 | $5,750 |
$(-290.0)
(-11,723)
kWh
|
$(-380.0)
-
kW-mo/yr
|
- | - |
$9,740
-
Tgal
|
- | |
| 06 | 2.1392: Replace purchased steam with other energy source | $77,640 | $85,000 | - | - |
$(-47,810.0)
-
MMBtu
|
$125,450
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $313,270 | $275,750 |
$(-290.0)
(-11,723)
kWh
|
$6,420
-
kW-mo/yr
|
$175,950
-
MMBtu
|
$125,450
-
MMBtu
|
$9,740
-
Tgal
|
$(-4,000.0) | ||
| TOTAL IMPLEMENTED | $15,700 | $20,000 | - | - |
$15,700
-
MMBtu
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs