ITAC Assessment: WV0372
ITAC logo
ITAC Assessment: WV0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Rebuilt aircraft engines
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 525
Plant Area 184,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 6,864
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,863 10,295,194
kWh
Electricity Demand $200,039 20,717
kW-mo/yr
Electricity Fees $2,434 -
Natural Gas $377,149 33,861
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,559 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,741

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28,998 $34,945 $17,416
685,665
kWh
$11,582
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $13,813 $2,000 - - $13,903
-
MMBtu
$(-90.0)
03 2.7111: Reduce illumination to minimum necessary levels $10,188 $511 $6,121
240,992
kWh
$4,067
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $7,107 $540 - - $7,107
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,593 $8,011 $2,975
117,138
kWh
$2,618
-
kW-mo/yr
- -
06 2.4157: Establish a predictive maintenance program $5,074 $4,500 $3,360
132,294
kWh
$2,234
-
kW-mo/yr
- $(-520.0)
07 2.4151: Develop a repair/replace policy $3,550 $890 $2,240
88,198
kWh
$1,490
-
kW-mo/yr
- $(-180.0)
08 2.4239: Eliminate or reduce compressed air usage $2,560 $2,750 $1,768
69,597
kWh
$792
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,523 - $914
35,995
kWh
$609
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $1,153 $460 $798
31,400
kWh
$355
-
kW-mo/yr
- -
TOTAL RECOMMENDED $79,559 $54,607 $35,592
1,401,279
kWh
$23,747
-
kW-mo/yr
$21,010
-
MMBtu
$(-790.0)
TOTAL IMPLEMENTED $39,741 $15,912 $15,610
614,617
kWh
$11,018
-
kW-mo/yr
$13,903
-
MMBtu
$(-790.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs