Assessment Year | 2008 |
---|---|
Principal Product | Rebuilt aircraft engines |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $100 M to 500M |
# of Employees | 525 |
Plant Area |
184,000
ft2
|
Annual Production | 400
pieces
|
Production Hrs. Annual | 6,864
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,863 | 10,295,194 |
kWh
|
$0.025 |
Electricity Demand | $200,039 | 20,717 |
kW-mo/yr
|
$9.66 |
Electricity Fees | $2,434 | - |
|
- |
Natural Gas | $377,149 | 33,861 |
MMBtu
|
$11.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,559 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,741 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,998 | $34,945 |
$17,416
685,665
kWh
|
$11,582
-
kW-mo/yr
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $13,813 | $2,000 | - | - |
$13,903
-
MMBtu
|
$(-90.0) | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $10,188 | $511 |
$6,121
240,992
kWh
|
$4,067
-
kW-mo/yr
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $7,107 | $540 | - | - |
$7,107
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,593 | $8,011 |
$2,975
117,138
kWh
|
$2,618
-
kW-mo/yr
|
- | - | |
06 | 2.4157: Establish a predictive maintenance program | $5,074 | $4,500 |
$3,360
132,294
kWh
|
$2,234
-
kW-mo/yr
|
- | $(-520.0) | |
07 | 2.4151: Develop a repair/replace policy | $3,550 | $890 |
$2,240
88,198
kWh
|
$1,490
-
kW-mo/yr
|
- | $(-180.0) | |
08 | 2.4239: Eliminate or reduce compressed air usage | $2,560 | $2,750 |
$1,768
69,597
kWh
|
$792
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,523 | - |
$914
35,995
kWh
|
$609
-
kW-mo/yr
|
- | - | |
10 | 2.4221: Install compressor air intakes in coolest locations | $1,153 | $460 |
$798
31,400
kWh
|
$355
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $79,559 | $54,607 |
$35,592
1,401,279
kWh
|
$23,747
-
kW-mo/yr
|
$21,010
-
MMBtu
|
$(-790.0) | ||
TOTAL IMPLEMENTED | $39,741 | $15,912 |
$15,610
614,617
kWh
|
$11,018
-
kW-mo/yr
|
$13,903
-
MMBtu
|
$(-790.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs