ITAC Assessment: HO0109
ITAC logo
ITAC Assessment: HO0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Molded Plastic Parts
NAICS
n/a
SIC 3641: Electric Lamp Bulbs and Tubes
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 70,000
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,327 1,064,478
kWh
Natural Gas $57,168 7,203
MMBtu
Fuel Oil #2 $14,173 2,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,587 $5,326 $5,587
39,273
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $509 $320 $509
3,517
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,804 $350 - $7,804
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $683 $680 $683
4,689
kWh
- -
05 2.1232: Keep boiler tubes clean $723 $2,000 - - $723
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $686 $315 $686
4,982
kWh
- -
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,515 $19,000 $12,496
87,925
kWh
$(-2,981.0)
-
MMBtu
-
TOTAL RECOMMENDED $25,507 $27,991 $19,961
140,386
kWh
$4,823
-
MMBtu
$723
-
MMBtu
TOTAL IMPLEMENTED $15,483 $8,671 $6,956
48,944
kWh
$7,804
-
MMBtu
$723
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs