ITAC Assessment: SD0694
ITAC logo
ITAC Assessment: SD0694
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aerospace metal parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 400,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,026,637 5,467,289
kWh
Electricity Demand $1,098,118 14,820
kW-mo/yr
Electricity Fees $18,304 -
Natural Gas $39,050 3,836
MMBtu
Waste Disposal Costs
Other Liquid (non-haz) $144,000 36,000
gal
TOTAL YEARLY COSTS $2,326,109
RECOMMENDED SAVINGS* $987,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.9114: Use solar heat to make electricty $343,390 $403,026 $129,982
692,131
kWh
$213,408
-
kW-mo/yr
-
02 2.3141: Use battery storage for demand control $331,268 $168,800 $(-6,628.2)
(-35,294)
kWh
$337,896
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $377 $169 $177
943
kWh
$200
-
kW-mo/yr
-
04 2.4223: Install direct acting units in place of compressed air pressure system in safety system $48,628 $48,200 $48,628
258,935
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $50,834 $15,400 $28,412
151,288
kWh
$22,422
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,051 $7,036 $5,062
26,954
kWh
$7,989
-
kW-mo/yr
-
07 4.212: Adopt in-house material generation $141,736 $464,200 $(-2,263.5)
(-12,053)
kWh
- $144,000
-
gal
08 2.4133: Use most efficient type of electric motors $7,710 $11,858 $3,757
20,006
kWh
$3,953
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $50,714 $22,284 $19,670
104,738
kWh
$31,044
-
kW-mo/yr
-
TOTAL RECOMMENDED $987,708 $1,140,973 $226,796
1,207,648
kWh
$616,912
-
kW-mo/yr
$144,000
-
gal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs