*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area 56,000
ft2
Annual Production 120,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,622 771,688
kWh
Natural Gas $12,175 2,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,741 $751 $2,200
31,067
kWh
- $541
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,604 $2,876 $1,245
17,585
kWh
- $359
03 2.7135: Install occupancy sensors $237 $300 $237
3,517
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $830 $2,950 $830
11,723
kWh
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $257 $539 $374
5,275
kWh
$(-117.0)
-
MMBtu
-
06 2.6231: Utilize controls to operate equipment only when needed $208 $55 $208
2,931
kWh
- -
07 2.6121: Reduce hot water temperature to the minimum required $120 $15 $98
1,465
kWh
$22
-
MMBtu
-
TOTAL RECOMMENDED $5,997 $7,486 $5,192
73,563
kWh
$(-95.0)
-
MMBtu
$900
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs