ITAC Assessment: LL0180
ITAC logo
ITAC Assessment: LL0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Coffee
NAICS 311920: Coffee and Tea Manufacturing
SIC 2095: Roasted Coffee
Sales Range $50
M
to 100
M
# of Employees 58
Plant Area 150,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,239 2,726,400
kWh
Electricity Demand $55,526 9,534
kW-mo/yr
Electricity Fees $8,156 -
Natural Gas $115,409 14,357
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $5,529 $100 $3,766
74,815
kWh
$1,540
-
kW-mo/yr
$223 - -
02 2.2511: Insulate bare equipment $3,304 $2,261 - - - $3,304
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $2,329 $430 $1,420
28,211
kWh
$815
-
kW-mo/yr
$94 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,131 $2,120 $2,045
40,807
kWh
- $86 - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,933 $15 $1,152
22,878
kWh
$703
-
kW-mo/yr
$78 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,325 $7,520 $811
16,110
kWh
$461
-
kW-mo/yr
$53 - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,160 $195 $1,113
22,116
kWh
- $47 - -
08 2.7135: Install occupancy sensors $374 $180 $168
3,335
kWh
$191
-
kW-mo/yr
$15 - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $200 $140 $67
1,332
kWh
$11
-
kW-mo/yr
$3 - $119
TOTAL RECOMMENDED $18,285 $12,961 $10,542
209,604
kWh
$3,721
-
kW-mo/yr
$599 $3,304
-
MMBtu
$119
TOTAL IMPLEMENTED $13,048 $10,685 $9,390
186,726
kWh
$3,018
-
kW-mo/yr
$521 - $119
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs