Assessment Year | 2003 |
---|---|
Principal Product | Coffee |
NAICS | 311920: Coffee and Tea Manufacturing |
SIC | 2095: Roasted Coffee |
Sales Range | $50 M to 100M |
# of Employees | 58 |
Plant Area |
150,000
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,239 | 2,726,400 |
kWh
|
$0.050 |
Electricity Demand | $55,526 | 9,534 |
kW-mo/yr
|
$5.82 |
Electricity Fees | $8,156 | - |
|
- |
Natural Gas | $115,409 | 14,357 |
MMBtu
|
$8.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,048 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $5,529 | $100 |
$3,766
74,815
kWh
|
$1,540
-
kW-mo/yr
|
$223 | - | - | |
02 | 2.2511: Insulate bare equipment | $3,304 | $2,261 | - | - | - |
$3,304
-
MMBtu
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $2,329 | $430 |
$1,420
28,211
kWh
|
$815
-
kW-mo/yr
|
$94 | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,131 | $2,120 |
$2,045
40,807
kWh
|
- | $86 | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,933 | $15 |
$1,152
22,878
kWh
|
$703
-
kW-mo/yr
|
$78 | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,325 | $7,520 |
$811
16,110
kWh
|
$461
-
kW-mo/yr
|
$53 | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,160 | $195 |
$1,113
22,116
kWh
|
- | $47 | - | - | |
08 | 2.7135: Install occupancy sensors | $374 | $180 |
$168
3,335
kWh
|
$191
-
kW-mo/yr
|
$15 | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $200 | $140 |
$67
1,332
kWh
|
$11
-
kW-mo/yr
|
$3 | - | $119 | |
TOTAL RECOMMENDED | $18,285 | $12,961 |
$10,542
209,604
kWh
|
$3,721
-
kW-mo/yr
|
$599 |
$3,304
-
MMBtu
|
$119 | ||
TOTAL IMPLEMENTED | $13,048 | $10,685 |
$9,390
186,726
kWh
|
$3,018
-
kW-mo/yr
|
$521 | - | $119 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs