Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

124

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous food preparations and kindred
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0387 #09 Y:2000 Reuse / recycle/ sell rubber products $2,320 -
OR0387 #08 Y:2000 Establish burner maintenance schedule for boilers $1,885 $300
OR0387 #07 Y:2000 Modify refrigeration system to operate at a lower pressure $3,400 $5,400
OR0387 #06 Y:2000 Use or replace with energy efficient substitutes $12,800 $5,850
OR0387 #05 Y:2000 Optimize lot sizes to reduce inventory carrying costs $57,000 $74,000
OR0387 #04 Y:2000 Utilize a less expensive cooling method $373,000 $580,000
OR0387 #03 Y:2000 Install refrigeration system to cool product $324,800 $138,000
OR0387 #02 Y:2000 Add equipment/ operators to reduce production bottleneck $440,800 $128,700
OR0387 #01 Y:2000 Add equipment/ operators to reduce production bottleneck $176,000 $5,000
OR0385 #07 Y:2000 Use most efficient type of electric motors $4,638 $10,431
OR0385 #06 Y:2000 Optimize plant power factor $670 $1,900
OR0385 #05 Y:2000 Make a practice of turning off lights when not needed $2,380 -
OR0385 #04 Y:2000 Modify refrigeration system to operate at a lower pressure $3,053 -
OR0385 #03 Y:2000 Establish burner maintenance schedule for boilers $7,231 $600
OR0385 #02 Y:2000 Minimize contamination of water before treatment $9,076 $12,220
OR0385 #01 Y:2000 Install automatic packing equipment $10,600 $58,000
SF0204 #08 Y:2000 Reuse / recycle/ sell paper products $615 $46
SF0204 #07 Y:2000 Utilize higher efficiency lamps and/or ballasts $714 $3,660
SF0204 #06 Y:2000 Use adjustable frequency drive or multiple speed motors on existing system $3,518 $13,006
SF0204 #05 Y:2000 Install occupancy sensors $891 $1,920