ITAC Assessment: OR0385
ITAC logo
ITAC Assessment: OR0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Fresh/Frozen Seafood
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 30,500
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 5,300
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,268 2,102,579
kWh
Electricity Demand $22,590 81,528
kW-mo/yr
Electricity Fees $4,771 -
LPG $58,596 6,783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,249

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 4.441: Install automatic packing equipment $10,600 $58,000 - - - - $10,600 - -
02 3.4131: Minimize contamination of water before treatment $9,076 $12,220 $(-390.0)
(-11,430)
kWh
$(-152.0)
-
kW-mo/yr
- - - $(-602.0) $10,220
-
Tgal
03 2.1231: Establish burner maintenance schedule for boilers $7,231 $600 - - - $7,231
-
MMBtu
- - -
04 2.2621: Modify refrigeration system to operate at a lower pressure $3,053 - $3,053
88,804
kWh
- - - - - -
05 2.7124: Make a practice of turning off lights when not needed $2,380 - $2,380
69,461
kWh
- - - - - -
06 2.3212: Optimize plant power factor $670 $1,900 - - $670 - - - -
07 2.4133: Use most efficient type of electric motors $4,638 $10,431 $3,545
103,165
kWh
$1,093
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $37,648 $83,151 $8,588
250,000
kWh
$941
-
kW-mo/yr
$670 $7,231
-
MMBtu
$10,600 $(-602.0) $10,220
-
Tgal
TOTAL IMPLEMENTED $14,249 $11,031 $5,925
172,626
kWh
$1,093
-
kW-mo/yr
- $7,231
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs