Assessment Year | 2001 |
---|---|
Principal Product | Artificial Crab/Surimi Seafood |
NAICS |
n/a
|
SIC | 2092: Prepared Fresh or Frozen Fish and Seafoods |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
100,000
ft2
|
Annual Production | 12,341,692
lb
|
Production Hrs. Annual | 4,824
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,749 | 2,556,300 |
kWh
|
$0.036 |
Electricity Demand | $21,466 | 64,224 |
kW-mo/yr
|
$0.33 |
Natural Gas | $171,146 | 25,110 |
MMBtu
|
$6.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,392,005 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $690,805 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $176,000 | $5,000 | - | - | - | - | - | - | - | $176,000 | - | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $440,800 | $128,700 | - | - | - | - | $291,600 | $(-12,900.0) | - | - | $162,100 | |
03 | 4.113: Install refrigeration system to cool product | $324,800 | $138,000 | - | - | - | - | - | - | $(-30,600.0) | - | $355,400 | |
04 | 2.2628: Utilize a less expensive cooling method | $373,000 | $580,000 |
$(-50,000.0)
(-1,393,000)
kWh
|
$(-15,000.0)
-
kW-mo/yr
|
- | - | - | $(-27,000.0) | $465,000 | - | - | |
05 | 4.323: Optimize lot sizes to reduce inventory carrying costs | $57,000 | $74,000 | - | - | - | - | - | $57,000 | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $12,800 | $5,850 | - | - |
$12,800
-
MMBtu
|
- | - | - | - | - | - | |
07 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,400 | $5,400 |
$3,400
96,939
kWh
|
- | - | - | - | - | - | - | - | |
08 | 2.1231: Establish burner maintenance schedule for boilers | $1,885 | $300 | - | - |
$1,885
-
MMBtu
|
- | - | - | - | - | - | |
09 | 3.5218: Reuse / recycle/ sell rubber products | $2,320 | - | - | - | - |
$2,560
-
lb
|
- | $(-240.0) | - | - | - | |
TOTAL RECOMMENDED | $1,392,005 | $937,250 |
$(-46,600.0)
(-1,296,061)
kWh
|
$(-15,000.0)
-
kW-mo/yr
|
$14,685
-
MMBtu
|
$2,560
-
lb
|
$291,600 | $16,860 | $434,400 | $176,000 | $517,500 | ||
TOTAL IMPLEMENTED | $690,805 | $213,850 | - | - |
$14,685
-
MMBtu
|
$2,560
-
lb
|
$291,600 | $43,860 | - | $176,000 | $162,100 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs