ITAC Assessment: OR0387
ITAC logo
ITAC Assessment: OR0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Artificial Crab/Surimi Seafood
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 12,341,692
lb
Production Hrs. Annual 4,824
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,749 2,556,300
kWh
Electricity Demand $21,466 64,224
kW-mo/yr
Natural Gas $171,146 25,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,392,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $690,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $176,000 $5,000 - - - - - - - $176,000 -
02 4.111: Add equipment/ operators to reduce production bottleneck $440,800 $128,700 - - - - $291,600 $(-12,900.0) - - $162,100
03 4.113: Install refrigeration system to cool product $324,800 $138,000 - - - - - - $(-30,600.0) - $355,400
04 2.2628: Utilize a less expensive cooling method $373,000 $580,000 $(-50,000.0)
(-1,393,000)
kWh
$(-15,000.0)
-
kW-mo/yr
- - - $(-27,000.0) $465,000 - -
05 4.323: Optimize lot sizes to reduce inventory carrying costs $57,000 $74,000 - - - - - $57,000 - - -
06 2.4322: Use or replace with energy efficient substitutes $12,800 $5,850 - - $12,800
-
MMBtu
- - - - - -
07 2.2621: Modify refrigeration system to operate at a lower pressure $3,400 $5,400 $3,400
96,939
kWh
- - - - - - - -
08 2.1231: Establish burner maintenance schedule for boilers $1,885 $300 - - $1,885
-
MMBtu
- - - - - -
09 3.5218: Reuse / recycle/ sell rubber products $2,320 - - - - $2,560
-
lb
- $(-240.0) - - -
TOTAL RECOMMENDED $1,392,005 $937,250 $(-46,600.0)
(-1,296,061)
kWh
$(-15,000.0)
-
kW-mo/yr
$14,685
-
MMBtu
$2,560
-
lb
$291,600 $16,860 $434,400 $176,000 $517,500
TOTAL IMPLEMENTED $690,805 $213,850 - - $14,685
-
MMBtu
$2,560
-
lb
$291,600 $43,860 - $176,000 $162,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs