Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous food preparations and kindred
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2613 #08 Y:2026 Use solar heat to make electricty $29,450 $438,603
UL2613 #07 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,278 $2,850
UL2613 #06 Y:2026 Recover waste heat from equipment $35,891 $32,500
UL2613 #05 Y:2026 Use outside cold water source as a supply of cooling water $43,299 $98,575
UL2613 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,937 $945
UL2613 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $4,409 -
UL2613 #02 Y:2026 Improve air circulation with destratification fans / other methods $6,794 $10,000
UL2613 #01 Y:2026 Install occupancy sensors $269 $106
UL2603 #07 Y:2026 Utilize higher efficiency lamps and/or ballasts $10,696 $20,685
UL2603 #06 Y:2026 Reduce illumination to minimum necessary levels $7,891 -
UL2603 #05 Y:2026 Use solar heat to make electricty $102,792 $1,093,593
UL2603 #04 Y:2026 Lower ceiling to reduce conditioned space $16,549 $21,600
UL2603 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $51,923 $8,888
UL2603 #02 Y:2026 Optimize plant power factor $146,871 $41,841
UL2603 #01 Y:2026 Use outside cold water source as a supply of cooling water $51,560 $583,665
UL2303 #07 Y:2023 Use outside cold water source as a supply of cooling water $6,194 $25,900
UL2303 #06 Y:2023 Install desiccant humidity control system $7,161 $21,450
UL2303 #05 Y:2023 Use solar heat to make electricty $36,831 $336,395
UL2303 #04 Y:2023 Use waste heat from hot flue gases to preheat $4,140 $7,650
UL2303 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $16,439 $34,126