ITAC Assessment: UL2303
ITAC logo
ITAC Assessment: UL2303
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Baking mixes
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 258
Plant Area 150,000
ft2
Annual Production 71,344
units
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $442,321 14,213,280
kWh
Electricity Demand $741,602 28,971
kW-mo/yr
Electricity Fees $170,716 -
Natural Gas $297,336 42,590
MMBtu
Waste Disposal Costs
Water Usage $45,169 10,153
Tgal
TOTAL YEARLY COSTS $1,697,144
RECOMMENDED SAVINGS* $122,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $43,641 $26,163 - - $43,641 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,504 - $2,775
89,183
kWh
$5,729
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,439 $34,126 $6,200
199,970
kWh
$10,239
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $4,140 $7,650 - - - $4,140
-
MMBtu
05 2.9114: Use solar heat to make electricty $36,831 $336,395 $14,489
465,573
kWh
$22,342
-
kW-mo/yr
- -
06 2.7273: Install desiccant humidity control system $7,161 $21,450 - $7,161
-
kW-mo/yr
- -
07 2.2692: Use outside cold water source as a supply of cooling water $6,194 $25,900 $6,194
199,800
kWh
- - -
TOTAL RECOMMENDED $122,910 $451,684 $29,658
954,526
kWh
$45,471
-
kW-mo/yr
$43,641 $4,140
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs