ITAC Assessment: AM0260
ITAC logo
ITAC Assessment: AM0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product O-rings, lip seals, V-packing
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 32,500
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 4,675
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,917 1,806,272
kWh
Electricity Demand $17,551 5,282
kW-mo/yr
Electricity Fees $1,035 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,635 $620 $1,035
41,325
kWh
$1,600
-
kW-mo/yr
- - - - -
02 2.8114: Change rate schedules or other changes in utility service $1,317 - - $(-17,317.0)
-
kW-mo/yr
$(-5,650.0) - - $24,284 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $870 $330 $30
2,345
kWh
$60
-
kW-mo/yr
- - $780 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $790 $400 $790
24,033
kWh
- - - - - -
05 2.6218: Turn off equipment when not in use $470 - $470
18,757
kWh
- - - - - -
06 3.7198: Reduce / eliminate use of disposable product $1,220 $110 - - - $310
-
lb
- - $910
07 3.5213: Reuse scrap printed paper for make-ready $700 $1,110 - - - $2,000
-
lb
- $(-1,300.0) -
TOTAL RECOMMENDED $8,002 $2,570 $2,325
86,460
kWh
$(-15,657.0)
-
kW-mo/yr
$(-5,650.0) $2,310
-
lb
$780 $22,984 $910
TOTAL IMPLEMENTED $2,830 $1,840 $1,290
45,135
kWh
$60
-
kW-mo/yr
- $2,000
-
lb
$780 $(-1,300.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs