ITAC Assessment: UU0280
ITAC logo
ITAC Assessment: UU0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Machine Parts and Fabricated Metals
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 30,000
ft2
Annual Production 784,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,293 1,995,160
kWh
Electricity Demand $76,101 4,485
kW-mo/yr
TOTAL YEARLY COSTS $198,394
RECOMMENDED SAVINGS* $67,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.2628: Utilize a less expensive cooling method $21,325 $74,279 $15,369
250,717
kWh
$5,956
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $8,865 $7,100 $7,754
127,113
kWh
$1,111
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $5,305 $5,305 $2,652
43,474
kWh
$2,653
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $4,000 $12,788 - - $4,000
05 2.9114: Use solar heat to make electricty $27,818 $116,050 $26,230
430,000
kWh
$1,588
-
kW-mo/yr
-
TOTAL RECOMMENDED $67,313 $215,522 $52,005
851,304
kWh
$11,309
-
kW-mo/yr
$4,000
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs