3,175
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SU0605 #08 Y:2026 | 08 | 2026 | Install vinyl strip / high speed / air curtain doors | $1,230 | $4,746 |
n/a
|
| SU0605 #07 Y:2026 | 07 | 2026 | Conserve energy by efficient use of vending machines | $104 | $187 |
n/a
|
| SU0605 #06 Y:2026 | 06 | 2026 | Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $801 | $1,268 |
n/a
|
| SU0605 #05 Y:2026 | 05 | 2026 | Install / repair insulation on steam lines | $266 | $408 |
n/a
|
| SU0605 #04 Y:2026 | 04 | 2026 | Use or replace with energy efficient substitutes | $404 | $303 |
n/a
|
| SU0605 #03 Y:2026 | 03 | 2026 | Reduce space conditioning during non-working hours | $9,917 | $200 |
n/a
|
| SU0605 #02 Y:2026 | 02 | 2026 | Eliminate/reduce an operation | $51 | - |
n/a
|
| SU0605 #01 Y:2026 | 01 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $5,844 | - |
n/a
|
| LS2607 #04 Y:2026 | 04 | 2026 | Eliminate old stock and modify inventory control | $18,250 | $25,000 |
n/a
|
| LS2607 #03 Y:2026 | 03 | 2026 | Install sub-metering equipment | $8,629 | $4,500 |
n/a
|
| LS2607 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $248 | $50 |
n/a
|
| LS2607 #01 Y:2026 | 01 | 2026 | Increase amount of waste recovered for resale | $32,800 | - |
n/a
|
| LT8448 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $556,491 | $7,323,896 |
n/a
|
| LT8448 #04 Y:2026 | 04 | 2026 | Install vinyl strip / high speed / air curtain doors | $23,347 | $12,442 |
n/a
|
| LT8448 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,744 | $7,251 |
n/a
|
| LT8448 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,180 | - |
n/a
|
| LT8448 #01 Y:2026 | 01 | 2026 | Modify refrigeration system to operate at a lower pressure | $59,448 | $219,165 |
n/a
|
| UC2606 #08 Y:2026 | 08 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $3,684 | $500 |
n/a
|
| UC2606 #07 Y:2026 | 07 | 2026 | Adjust burners for efficient operation | $676 | $800 |
n/a
|
| UC2606 #06 Y:2026 | 06 | 2026 | Use waste heat from hot flue gases to preheat | $2,247 | $10,000 |
n/a
|