3,097
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
LT8428 #10 Y:2025 | 10 | 2025 | Meter waste water | $137,009 | $13,815 |
n/a
|
LT8428 #09 Y:2025 | 09 | 2025 | Use solar heat to make electricty | $150,032 | $2,112,000 |
n/a
|
LT8428 #08 Y:2025 | 08 | 2025 | Use photocell controls | $417 | $340 |
n/a
|
LT8428 #07 Y:2025 | 07 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,778 | - |
n/a
|
LT8428 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $56,354 | $50,550 |
n/a
|
LT8428 #05 Y:2025 | 05 | 2025 | Use most efficient type of electric motors | $40,176 | $29,500 |
n/a
|
LT8428 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $2,409 | $19,947 |
n/a
|
LT8428 #03 Y:2025 | 03 | 2025 | Modify refrigeration system to operate at a lower pressure | $48,711 | $140,984 |
n/a
|
LT8428 #02 Y:2025 | 02 | 2025 | Increase amount of condensate returned | $192,452 | $260,000 |
n/a
|
LT8428 #01 Y:2025 | 01 | 2025 | Reduce excessive boiler blowdown | $18,064 | $6,000 |
n/a
|
NL0118 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $634 | $608 |
n/a
|
NL0118 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $636 | $165 |
n/a
|
NL0118 #03 Y:2025 | 03 | 2025 | Meter waste water | $857 | $985 |
n/a
|
NL0118 #02 Y:2025 | 02 | 2025 | Meter waste water | $3,352 | $1,575 |
n/a
|
NL0118 #01 Y:2025 | 01 | 2025 | Recharge batteries on during off-peak demand periods | $15,441 | $550 |
n/a
|
NL0117 #06 Y:2025 | 06 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $112 | $260 |
n/a
|
NL0117 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $293 | $70 |
n/a
|
NL0117 #04 Y:2025 | 04 | 2025 | Apply for tax-free status for energy purchases | $366 | $120 |
n/a
|
NL0117 #03 Y:2025 | 03 | 2025 | Use or replace with energy efficient substitutes | $523 | $1,530 |
n/a
|
NL0117 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,209 | $600 |
n/a
|