Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flavoring extracts and flavoring syrups, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0386 #10 Y:2014 Replace electrically-operated equipment with fossil fuel equipment $2,010 $6,000
LE0386 #09 Y:2014 Replace existing hvac unit with high efficiency model $757 $2,250
LE0386 #08 Y:2014 Use / purchase optimum sized compressor $6,813 $20,000
LE0386 #07 Y:2014 Replace boiler $102,338 $161,800
LE0386 #06 Y:2014 Preheat combustion air with waste heat $12,502 $16,700
LE0386 #05 Y:2014 Repair furnaces and oven doors so that they seal efficiently $451 $232
LE0386 #04 Y:2014 Analyze flue gas for proper air/fuel ratio $43,975 $10,000
LE0386 #03 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $10,910 $1,000
LE0386 #02 Y:2014 Repair and eliminate steam leaks $61,300 $2,592
LE0386 #01 Y:2014 Reduce the pressure of compressed air to the minimum required $8,661 $32
LE0323 #09 Y:2011 Utilize energy-efficient belts and other improved mechanisms $778 -
LE0323 #08 Y:2011 Utilize higher efficiency lamps and/or ballasts $837 $2,921
LE0323 #07 Y:2011 Use or replace with energy efficient substitutes $1,240 $542
LE0323 #06 Y:2011 Install soft-start to eliminate nuisance trips $2,360 $6,000
LE0323 #05 Y:2011 Use or replace with energy efficient substitutes $2,867 $192
LE0323 #04 Y:2011 Reschedule plant operations or reduce load to avoid peaks $4,933 $3,000
LE0323 #03 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $8,384 $1,000
LE0323 #02 Y:2011 Use solar heat to heat water $11,446 $21,000
LE0323 #01 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $30,859 $30,000
LE0246 #09 Y:2006 Install occupancy sensors $1,586 $450