ITAC Assessment: LE0246
ITAC logo
ITAC Assessment: LE0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fountain Syrup
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range n/a
# of Employees 75
Plant Area 250,000
ft2
Annual Production 60,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $384,587 6,964,200
kWh
Electricity Demand $115,401 16,136
kW-mo/yr
Natural Gas $29,431 2,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Water Consumption Savings
01 2.5196: Use small number of high output units instead of many small inefficient units $66,327 $5,000 - - - $41,818
-
Tgal
$24,509
-
Tgal
02 3.5132: Reuse rich white water in other applications $14,590 $20,000 - - - $9,199
-
Tgal
$5,391
-
Tgal
03 2.4231: Reduce the pressure of compressed air to the minimum required $9,683 $6,700 $7,746
140,843
kWh
$1,937
-
kW-mo/yr
- - -
04 3.4151: Minimize water usage $6,264 $1,800 $590
10,729
kWh
- - $3,577
-
Tgal
$2,097
-
Tgal
05 2.7226: Use computer programs to optimize hvac performance $6,033 $5,000 $4,827
87,759
kWh
$1,206
-
kW-mo/yr
- - -
06 2.6231: Utilize controls to operate equipment only when needed $3,372 $2,500 $3,372
61,304
kWh
- - - -
07 2.8122: Use utility controlled power management $3,000 $100 - - $3,000 - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $10,948 $180,000 $8,758
159,245
kWh
$2,190
-
kW-mo/yr
- - -
09 2.7135: Install occupancy sensors $1,586 $450 $1,586
28,829
kWh
- - - -
TOTAL RECOMMENDED $121,803 $221,550 $26,879
488,709
kWh
$5,333
-
kW-mo/yr
$3,000 $54,594
-
Tgal
$31,997
-
Tgal
TOTAL IMPLEMENTED $94,577 $197,150 $22,917
416,676
kWh
$5,333
-
kW-mo/yr
- $41,818
-
Tgal
$24,509
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs