Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,780

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Bottled and canned soft drinks and carbonated waters
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2515 #07 Y:2025 Replace existing equipment with more suitable substitutes $55,591 $500,000
LS2515 #06 Y:2025 Use solar heat to make electricty $25,948 $187,200
LS2515 #05 Y:2025 Clean or color roof to reduce solar load $5,344 $26,721
LS2515 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $37,258 $144,549
LS2515 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,245 $6,160
LS2515 #02 Y:2025 Install timers and/or thermostats $10,625 $35
LS2515 #01 Y:2025 Regrind, reuse, or sell scrap plastic parts $12,408 -
SU0570 #08 Y:2025 Use solar heat to make electricty $100,134 $628,503
SU0570 #07 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $3,969 $16,085
SU0570 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $683 $2,500
SU0570 #05 Y:2025 Use or replace with energy efficient substitutes $1,569 $2,693
SU0570 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,489 $3,432
SU0570 #03 Y:2025 Improve air circulation with destratification fans / other methods $3,146 $1,150
SU0570 #02 Y:2025 Reduce space conditioning during non-working hours $6,574 $1,490
SU0570 #01 Y:2025 Apply for tax-free status for energy purchases $30,496 $65
UF0623 #08 Y:2024 Replace existing equipment with more suitable substitutes $56,000 $20,720
UF0623 #07 Y:2024 Improve combustion control capability $958 $1,400
UF0623 #06 Y:2024 Install turbulators $979 $3,750
UF0623 #05 Y:2024 Turn off equipment when not in use $1,616 -
UF0623 #04 Y:2024 Install de-aerator in place of condensate tank $2,627 $2,343