Assessment Year | 2024 |
---|---|
Principal Product | Liquid Beverage Concentrates & Syrups |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
41,000
ft2
|
Annual Production | 2,579
Tgal
|
Production Hrs. Annual | 4,750
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $57,824 | 632,424 |
kWh
|
$0.091 | |
Electricity Demand | $20,392 | 1,707 |
kW-mo/yr
|
$11.95 | |
Electricity Fees | $8,707 | - |
|
- | |
Natural Gas | $22,790 | 2,111 |
MMBtu
|
$10.80 | |
Waste Disposal Costs | |||||
Water Usage | $1 | 2,579 |
Tgal
|
$0.000 | |
TOTAL YEARLY COSTS | $109,714 | ||||
RECOMMENDED SAVINGS* | $98,414 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $21,088 | $3,402 |
$4,029
44,270
kWh
|
$17,059
-
kW-mo/yr
|
- | - | |
02 | 2.2442: Preheat combustion air with waste heat | $11,057 | $4,000 | - | - |
$11,057
-
MMBtu
|
- | |
03 | 2.5122: Replace high resistance ducts, pipes, and fittings | $4,089 | $5,440 |
$4,089
44,944
kWh
|
- | - | - | |
04 | 2.2124: Install de-aerator in place of condensate tank | $2,627 | $2,343 | - | - |
$2,627
-
MMBtu
|
- | |
05 | 2.6218: Turn off equipment when not in use | $1,616 | - |
$1,616
17,759
kWh
|
- | - | - | |
06 | 2.1222: Install turbulators | $979 | $3,750 | - | - |
$979
-
MMBtu
|
- | |
07 | 2.1116: Improve combustion control capability | $958 | $1,400 | - | - |
$958
-
MMBtu
|
- | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $56,000 | $20,720 | - | - | - | $56,000 | |
TOTAL RECOMMENDED | $98,414 | $41,055 |
$9,734
106,973
kWh
|
$17,059
-
kW-mo/yr
|
$15,621
-
MMBtu
|
$56,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs