ITAC Assessment: UF0623
ITAC logo
ITAC Assessment: UF0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Liquid Beverage Concentrates & Syrups
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 41,000
ft2
Annual Production 2,579
Tgal
Production Hrs. Annual 4,750
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,824 632,424
kWh
Electricity Demand $20,392 1,707
kW-mo/yr
Electricity Fees $8,707 -
Natural Gas $22,790 2,111
MMBtu
Waste Disposal Costs
Water Usage $1 2,579
Tgal
TOTAL YEARLY COSTS $109,714
RECOMMENDED SAVINGS* $98,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $21,088 $3,402 $4,029
44,270
kWh
$17,059
-
kW-mo/yr
- -
02 2.2442: Preheat combustion air with waste heat $11,057 $4,000 - - $11,057
-
MMBtu
-
03 2.5122: Replace high resistance ducts, pipes, and fittings $4,089 $5,440 $4,089
44,944
kWh
- - -
04 2.2124: Install de-aerator in place of condensate tank $2,627 $2,343 - - $2,627
-
MMBtu
-
05 2.6218: Turn off equipment when not in use $1,616 - $1,616
17,759
kWh
- - -
06 2.1222: Install turbulators $979 $3,750 - - $979
-
MMBtu
-
07 2.1116: Improve combustion control capability $958 $1,400 - - $958
-
MMBtu
-
08 4.652: Replace existing equipment with more suitable substitutes $56,000 $20,720 - - - $56,000
TOTAL RECOMMENDED $98,414 $41,055 $9,734
106,973
kWh
$17,059
-
kW-mo/yr
$15,621
-
MMBtu
$56,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs