Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fats and oils
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0353 #05 Y:2010 Utilize energy-efficient belts and other improved mechanisms $6,266 $1,050
MS0353 #04 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $8,131 $322
MS0353 #03 Y:2010 Repair and eliminate steam leaks $19,240 $312
MS0353 #02 Y:2010 Utilize higher efficiency lamps and/or ballasts $34,831 $57,360
MS0353 #01 Y:2010 Use waste heat to produce steam to drive a steam turbine-generator $1,522,531 $8,282,000
MS0257 #11 Y:2004 Utilize higher efficiency lamps and/or ballasts $535 $969
MS0257 #10 Y:2004 Install / repair insulation on steam lines $632 $1,029
MS0257 #09 Y:2004 Install compressor air intakes in coolest locations $1,231 $255
MS0257 #08 Y:2004 Eliminate or reduce compressed air usage $1,163 $742
MS0257 #07 Y:2004 Use optimum thickness insulation $3,906 $1,356
MS0257 #06 Y:2004 Install timers on light switches in little used areas $6,318 $2,673
MS0257 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $15,325 $348
MS0257 #04 Y:2004 Utilize higher efficiency lamps and/or ballasts $15,889 $17,026
MS0257 #03 Y:2004 Repair and eliminate steam leaks $36,924 $54
MS0257 #02 Y:2004 Analyze flue gas for proper air/fuel ratio $67,341 $2,000
MS0257 #01 Y:2004 Utilize energy-efficient belts and other improved mechanisms $71,237 $88,344
MS0089 #06 Y:1997 Eliminate shift $139,776 -
MS0089 #05 Y:1997 Separate and recycle scrap metal to foundry or for sale $480 -
MS0089 #04 Y:1997 Analyze flue gas for proper air/fuel ratio $17,921 $1,000
MS0089 #03 Y:1997 Use waste heat from hot flue gases to preheat $39,339 $58,400