Assessment Year | 2004 |
---|---|
Principal Product | Cottonseed Oil |
NAICS | 311224: Soybean and Other Oilseed Processing |
SIC | 2074: Cottonseed Oil Mills |
Sales Range | $50 M to 100M |
# of Employees | 92 |
Plant Area |
1,000,000
ft2
|
Annual Production | 280,000
ton
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,411,815 | 28,039,200 |
kWh
|
$0.050 |
Electricity Demand | $166,001 | 65,895 |
kW-mo/yr
|
$2.52 |
Electricity Fees | $54,244 | - |
|
- |
Natural Gas | $1,173,701 | 182,521 |
MMBtu
|
$6.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $220,501 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $126,540 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $71,237 | $88,344 |
$63,496
1,266,636
kWh
|
$4,658
-
kW-mo/yr
|
$3,083 | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $67,341 | $2,000 | - | - | - |
$67,341
-
MMBtu
|
|
03 | 2.2135: Repair and eliminate steam leaks | $36,924 | $54 | - | - | - |
$36,924
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,889 | $17,026 | n/a |
$14,165
282,564
kWh
|
$1,037
-
kW-mo/yr
|
$687 | - |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,325 | $348 |
$14,527
289,796
kWh
|
- | $798 | - | |
06 | 2.7132: Install timers on light switches in little used areas | $6,318 | $2,673 |
$5,989
119,477
kWh
|
- | $329 | - | |
07 | 2.2515: Use optimum thickness insulation | $3,906 | $1,356 | - | - | - |
$3,906
-
MMBtu
|
|
08 | 2.4239: Eliminate or reduce compressed air usage | $1,163 | $742 |
$1,103
21,998
kWh
|
- | $60 | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,231 | $255 |
$1,094
21,828
kWh
|
$84
-
kW-mo/yr
|
$53 | - | |
10 | 2.2136: Install / repair insulation on steam lines | $632 | $1,029 | - | - | - |
$632
-
MMBtu
|
|
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $535 | $969 |
$477
9,513
kWh
|
$35
-
kW-mo/yr
|
$23 | - | |
TOTAL RECOMMENDED | $220,501 | $114,796 |
$100,851
2,011,812
kWh
|
$5,814
-
kW-mo/yr
|
$5,033 |
$108,803
-
MMBtu
|
||
TOTAL IMPLEMENTED | $126,540 | $6,104 |
$20,516
409,273
kWh
|
- | $1,127 |
$104,897
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs