ITAC Assessment: MS0353
ITAC logo
ITAC Assessment: MS0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product POULTRY RENEWABLES
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2077: Animal and Marine Fats and Oils
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 51,200
ft2
Annual Production 195,000
ton
Production Hrs. Annual 6,864
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,026,898 26,742,660
kWh
Electricity Demand $318,041 58,830
kW-mo/yr
Electricity Fees $(-82,227.0) -
Natural Gas $5,061,139 1,082,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,590,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $1,522,531 $8,282,000 - - - - $1,522,531
02 2.7142: Utilize higher efficiency lamps and/or ballasts $34,831 $57,360 $27,523
719,567
kWh
$6,793
-
kW-mo/yr
$515 - -
03 2.2135: Repair and eliminate steam leaks $19,240 $312 - - $284 $18,956
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,131 $322 $8,011
188,496
kWh
- $120 - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,266 $1,050 $4,613
120,610
kWh
$1,560
-
kW-mo/yr
$93 - -
TOTAL RECOMMENDED $1,590,999 $8,341,044 $40,147
1,028,673
kWh
$8,353
-
kW-mo/yr
$1,012 $18,956
-
MMBtu
$1,522,531
TOTAL IMPLEMENTED $62,202 $57,994 $35,534
908,063
kWh
$6,793
-
kW-mo/yr
$919 $18,956
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs