ITAC Assessment: MI0246
ITAC logo
ITAC Assessment: MI0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pharmacutical
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 55,000
ft2
Annual Production 300,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,859 3,622,324
kWh
Electricity Demand $69,603 6,618
kW-mo/yr
Electricity Fees $38,218 -
Natural Gas $36,500 8,178
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,051 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $30,416 $2,300 $15,133
302,660
kWh
$15,283
-
kW-mo/yr
- -
02 2.7425: Clean or color roof to reduce solar load $14,747 $17,000 $9,340
186,816
kWh
$5,407
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,442 $1,660 $3,794
75,878
kWh
$1,648
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $2,851 $417 $2,022
40,272
kWh
$829
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,190 $2,520 - - $2,190
-
MMBtu
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,076 $6,910 $1,292
25,846
kWh
$784
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,508 $4,420 $950
19,006
kWh
$558
-
kW-mo/yr
- -
08 4.821: Pay bills on time to avoid late fees $945 $240 - - - $945
09 2.4231: Reduce the pressure of compressed air to the minimum required $876 $80 $681
13,620
kWh
$195
-
kW-mo/yr
- -
TOTAL RECOMMENDED $61,051 $35,547 $33,212
664,098
kWh
$24,704
-
kW-mo/yr
$2,190
-
MMBtu
$945
TOTAL IMPLEMENTED $53,934 $25,700 $29,898
597,980
kWh
$23,091
-
kW-mo/yr
- $945
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs