Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Salted and roasted nuts and seeds
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0611 #06 Y:2023 Use solar heat to make electricty $165,339 $1,651,070
SF0611 #05 Y:2023 Preheat boiler makeup water with waste process heat $8,909 $18,675
SF0611 #04 Y:2023 Eliminate or reduce compressed air usage $6,353 $2,100
SF0611 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $61,975 $1,800
SF0611 #02 Y:2023 Turn off equipment when not in use $4,908 -
SF0611 #01 Y:2023 Turn off equipment when not in use $14,817 -
SF0608 #11 Y:2023 Use solar heat to make electricty $326,216 $2,215,771
SF0608 #10 Y:2023 Install occupancy sensors $15,936 $78,007
SF0608 #09 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $14,376 $15,156
SF0608 #08 Y:2023 Install vinyl strip / high speed / air curtain doors $39,597 $29,794
SF0608 #07 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $71,828 $51,150
SF0608 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $101,250 $48,266
SF0608 #05 Y:2023 Utilize controls to operate equipment only when needed $11,235 $4,654
SF0608 #04 Y:2023 Turn off equipment when not in use $1,050 -
SF0608 #03 Y:2023 Reduce space conditioning during non-working hours $29,842 $690
SF0608 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $8,322 -
SF0608 #01 Y:2023 Chill water to the highest temperature possible $16,747 $400
NL0085 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $469 $525
NL0085 #04 Y:2023 Change rate schedules or other changes in utility service $808 $25
NL0085 #03 Y:2023 Improve air circulation with destratification fans / other methods $3,403 $10,178