ITAC Assessment: SF0608
ITAC logo
ITAC Assessment: SF0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Almonds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range greater than $500
M
# of Employees 1,200
Plant Area 823,400
ft2
Annual Production 438,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,244,423 20,020,579
kWh
Electricity Demand $31,795 9,759
kW-mo/yr
Electricity Fees $240,595 -
Natural Gas $659,429 79,020
MMBtu
TOTAL YEARLY COSTS $3,176,242
RECOMMENDED SAVINGS* $636,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $106,793

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $16,747 $400 $16,747
133,227
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,322 - $8,322
66,209
kWh
-
03 2.7224: Reduce space conditioning during non-working hours $29,842 $690 $16,074
127,878
kWh
$13,768
-
MMBtu
04 2.6218: Turn off equipment when not in use $1,050 - $1,050
8,360
kWh
-
05 2.6231: Utilize controls to operate equipment only when needed $11,235 $4,654 $11,235
89,377
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $101,250 $48,266 $101,250
805,489
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $71,828 $51,150 $71,828
571,427
kWh
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $39,597 $29,794 $39,597
315,009
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,376 $15,156 $14,376
114,371
kWh
-
10 2.7135: Install occupancy sensors $15,936 $78,007 $15,936
107,236
kWh
-
11 2.9114: Use solar heat to make electricty $326,216 $2,215,771 $326,216
2,595,198
kWh
-
TOTAL RECOMMENDED $636,399 $2,443,888 $622,631
4,933,781
kWh
$13,768
-
MMBtu
TOTAL IMPLEMENTED $106,793 $35,538 $93,025
740,060
kWh
$13,768
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs