Assessment Year | 2023 |
---|---|
Principal Product | Almonds |
NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
SIC | 2068: Salted and Roasted Nuts and Seeds |
Sales Range | greater than $500 M |
# of Employees | 1,200 |
Plant Area |
823,400
ft2
|
Annual Production | 438,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,244,423 | 20,020,579 |
kWh
|
$0.11 |
Electricity Demand | $31,795 | 9,759 |
kW-mo/yr
|
$3.26 |
Electricity Fees | $240,595 | - |
|
- |
Natural Gas | $659,429 | 79,020 |
MMBtu
|
$8.35 |
TOTAL YEARLY COSTS | $3,176,242 | |||
RECOMMENDED SAVINGS* | $636,399 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $106,793 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2625: Chill water to the highest temperature possible | $16,747 | $400 |
$16,747
133,227
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,322 | - |
$8,322
66,209
kWh
|
- | |
03 | 2.7224: Reduce space conditioning during non-working hours | $29,842 | $690 |
$16,074
127,878
kWh
|
$13,768
-
MMBtu
|
|
04 | 2.6218: Turn off equipment when not in use | $1,050 | - |
$1,050
8,360
kWh
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $11,235 | $4,654 |
$11,235
89,377
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $101,250 | $48,266 |
$101,250
805,489
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $71,828 | $51,150 |
$71,828
571,427
kWh
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $39,597 | $29,794 |
$39,597
315,009
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $14,376 | $15,156 |
$14,376
114,371
kWh
|
- | |
10 | 2.7135: Install occupancy sensors | $15,936 | $78,007 |
$15,936
107,236
kWh
|
- | |
11 | 2.9114: Use solar heat to make electricty | $326,216 | $2,215,771 |
$326,216
2,595,198
kWh
|
- | |
TOTAL RECOMMENDED | $636,399 | $2,443,888 |
$622,631
4,933,781
kWh
|
$13,768
-
MMBtu
|
||
TOTAL IMPLEMENTED | $106,793 | $35,538 |
$93,025
740,060
kWh
|
$13,768
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs