Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

70

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cane sugar refining
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0342 #07 Y:2025 Use solar heat to make electricty $9,493 $73,605
TT0342 #06 Y:2025 Recover waste heat from equipment $1,715 $5,000
TT0342 #05 Y:2025 Reduce space conditioning during non-working hours $55 $100
TT0342 #04 Y:2025 Install occupancy sensors $867 $1,450
TT0342 #03 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,629 $950
TT0342 #02 Y:2025 Use a different or recycled raw material $48,769 $16,924
TT0342 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $5,622 $450
LS2314 #06 Y:2023 Use solar heat to make electricty $40,199 $309,000
LS2314 #05 Y:2023 Use most efficient type of electric motors $25,291 $89,400
LS2314 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $12,651 $11,390
LS2314 #03 Y:2023 Insulate bare equipment $3,222 $660
LS2314 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,404 $135
LS2314 #01 Y:2023 Make a practice of turning off lights when not needed $1,310 -
LE0411 #11 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,246 $16,912
LE0411 #10 Y:2015 Use waste heat from hot flue gases to generate steam $102,584 $458,390
LE0411 #09 Y:2015 Use optimum size and capacity equipment $2,849 $6,000
LE0411 #08 Y:2015 Replace existing chiller with high efficiency model $58,696 $100,000
LE0411 #07 Y:2015 Install / repair insulation on steam lines $1,450 $1,450
LE0411 #06 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $1,675 $1,000
LE0411 #05 Y:2015 Insulate bare equipment $21,409 $9,106