Assessment Year | 2016 |
---|---|
Principal Product | Sugar & Syrup |
NAICS | 311221: Wet Corn Milling |
SIC | 2062: Cane Sugar Refining |
Sales Range | $50 M to 100M |
# of Employees | 73 |
Plant Area |
65,000
ft2
|
Annual Production | 125,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $148,399 | 2,743,008 |
kWh
|
$0.054 |
Electricity Demand | $5,232 | 1,248 |
kW-mo/yr
|
$4.19 |
Electricity Fees | $35,200 | - |
|
- |
Natural Gas | $332,783 | 67,274 |
MMBtu
|
$4.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $214,899 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,016 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $22 | - |
$22
414
kWh
|
- | - | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $16,142 | $25 | - | - |
$16,142
-
MMBtu
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $3,533 | $150 |
$3,533
65,432
kWh
|
- | - | - | - | |
04 | 2.7261: Install timers and/or thermostats | $3,292 | $625 |
$50
924
kWh
|
- |
$3,242
-
MMBtu
|
- | - | |
05 | 2.2511: Insulate bare equipment | $21,409 | $9,106 | - | - |
$21,409
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,675 | $1,000 |
$1,411
26,137
kWh
|
$264
-
kW-mo/yr
|
- | - | - | |
07 | 2.2136: Install / repair insulation on steam lines | $1,450 | $1,450 | - | - |
$1,450
-
MMBtu
|
- | - | |
08 | 2.2622: Replace existing chiller with high efficiency model | $58,696 | $100,000 |
$(-1,603.8)
(-29,700)
kWh
|
- | - | $60,300 | - | |
09 | 2.4323: Use optimum size and capacity equipment | $2,849 | $6,000 |
$2,849
52,757
kWh
|
- | - | - | - | |
10 | 2.2422: Use waste heat from hot flue gases to generate steam | $102,584 | $458,390 | - | - |
$152,584
-
MMBtu
|
$(-50,000.0) | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,246 | $16,912 |
$2,136
39,562
kWh
|
$453
-
kW-mo/yr
|
- | - | $657 | |
TOTAL RECOMMENDED | $214,899 | $593,658 |
$8,398
155,526
kWh
|
$716
-
kW-mo/yr
|
$194,827
-
MMBtu
|
$10,300 | $657 | ||
TOTAL IMPLEMENTED | $108,016 | $127,818 |
$5,550
102,769
kWh
|
$716
-
kW-mo/yr
|
$40,793
-
MMBtu
|
$60,300 | $657 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs