ITAC Assessment: UM0427
ITAC logo
ITAC Assessment: UM0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Liquid, granular, and brown sucrose from cane sugar
NAICS 311314: Cane Sugar Manufacturing
SIC 2062: Cane Sugar Refining
Sales Range $50
M
to 100
M
# of Employees 90
Plant Area 150,000
ft2
Annual Production 90,000
ton
Production Hrs. Annual 7,920
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $561,491 4,468,320
kWh
Natural Gas $1,042,759 172,506
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $290,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,586

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,442 $10,650 $10,442
82,875
kWh
-
02 2.2414: Use waste heat from hot flue gases to preheat $13,680 $9,000 - $13,680
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $21,140 $5,000 - $21,140
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,906 $6,500 $27,906
221,473
kWh
-
05 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $196,098 $500,000 $491,400
3,900,000
kWh
$(-295,302.0)
-
MMBtu
06 2.3312: Install efficient rectifiers $20,863 $12,000 $20,863
165,581
kWh
-
TOTAL RECOMMENDED $290,129 $543,150 $550,611
4,369,929
kWh
$(-260,482.0)
-
MMBtu
TOTAL IMPLEMENTED $41,586 $15,500 $27,906
221,473
kWh
$13,680
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs