1,075
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SJ0056 #09 Y:2026 | 09 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $587 | $100 |
n/a
|
| SJ0056 #08 Y:2026 | 08 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,009 | $2,699 |
n/a
|
| SJ0056 #07 Y:2026 | 07 | 2026 | Utilize higher efficiency lamps and/or ballasts | $18,161 | $65,038 |
n/a
|
| SJ0056 #06 Y:2026 | 06 | 2026 | Use solar heat to make electricty | $212,681 | $1,044,647 |
n/a
|
| SJ0056 #05 Y:2026 | 05 | 2026 | User battery storage for power quality issues | $252,404 | $694,340 |
n/a
|
| SJ0056 #04 Y:2026 | 04 | 2026 | Preheat boiler makeup water with waste process heat | $29,218 | $8,641 |
n/a
|
| SJ0056 #03 Y:2026 | 03 | 2026 | Install compressor air intakes in coolest locations | $914 | $2,155 |
n/a
|
| SJ0056 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,694 | - |
n/a
|
| SJ0056 #01 Y:2026 | 01 | 2026 | Insulate bare equipment | $228 | $81 |
n/a
|
| UF0649 #09 Y:2026 | 09 | 2026 | Re-arrange equipment layout to reduce labor costs | $3,096 | $3,360 |
n/a
|
| UF0649 #08 Y:2026 | 08 | 2026 | Turn off steam / hot water lines leading to space heating units | $1,026 | $3,500 |
n/a
|
| UF0649 #07 Y:2026 | 07 | 2026 | Install soft-start to eliminate nuisance trips | $2,089 | $1,924 |
n/a
|
| UF0649 #06 Y:2026 | 06 | 2026 | Minimize condenser cooling water temperature | $2,060 | $1,508 |
n/a
|
| UF0649 #05 Y:2026 | 05 | 2026 | Reduce the pressure of compressed air to the minimum required | $2,034 | - |
n/a
|
| UF0649 #04 Y:2026 | 04 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $3,419 | - |
n/a
|
| UF0649 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $18,881 | $28,178 |
n/a
|
| UF0649 #02 Y:2026 | 02 | 2026 | Direct warmest air to combustion intake | $28,912 | $11,000 |
n/a
|
| UF0649 #01 Y:2026 | 01 | 2026 | Use solar heat to make electricty | $187,521 | $772,200 |
n/a
|
| UF0648 #09 Y:2026 | 09 | 2026 | Re-arrange equipment layout to reduce labor costs | $3,096 | $3,360 |
n/a
|
| UF0648 #08 Y:2026 | 08 | 2026 | Improve space comfort conditioning | $28,544 | $6,210 |
n/a
|