ITAC Assessment: UF0648
ITAC logo
ITAC Assessment: UF0648
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Peanuts Packaging
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 93,100,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $368,438 4,013,040
kWh
Electricity Fees $57,445 -
Natural Gas $101,993 87,431
MMBtu
TOTAL YEARLY COSTS $527,876
RECOMMENDED SAVINGS* $133,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $60,816 $375,213 $60,816
661,039
kWh
- - - -
02 2.3191: Use demand controller or load shedder $27,690 $21,590 $27,690
300,978
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,076 $360 $5,076
55,174
kWh
- - - -
04 2.1213: Direct warmest air to combustion intake $3,734 $11,000 - $3,734
-
MMBtu
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,413 - $2,413
26,227
kWh
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,879 - $1,691
18,380
kWh
- $79 - $109
07 4.424: Improve space comfort conditioning $28,544 $6,210 $(-576.0)
(-6,258)
kWh
- - $29,120 -
08 4.513: Re-arrange equipment layout to reduce labor costs $3,096 $3,360 - - - $3,096 -
TOTAL RECOMMENDED $133,248 $417,733 $97,110
1,055,540
kWh
$3,734
-
MMBtu
$79 $32,216 $109
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs