ITAC Assessment: OR0159
ITAC logo
ITAC Assessment: OR0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product VENEER
NAICS
n/a
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 29
Plant Area
n/a
Annual Production 40,900
thousand feet
Production Hrs. Annual 6,500
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,328 2,451,641
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,990

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4239: Eliminate or reduce compressed air usage $1,183 $670 $1,183
37,808
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,001 $4,750 $4,001
98,769
kWh
03 2.4239: Eliminate or reduce compressed air usage $1,062 $4,140 $1,062
33,998
kWh
04 2.7111: Reduce illumination to minimum necessary levels $2,364 $928 $2,364
44,549
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $499 - $499
10,551
kWh
06 2.4133: Use most efficient type of electric motors $413 $1,810 $413
8,792
kWh
07 2.3191: Use demand controller or load shedder $10,380 $9,000 $10,380
-
kWh
TOTAL RECOMMENDED $19,902 $21,298 $19,902
234,467
kWh
TOTAL IMPLEMENTED $18,990 $19,488 $18,990
215,124
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs