Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cookies and crackers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1111 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $690 $953
UD1111 #06 Y:2025 Install compressor air intakes in coolest locations $1,406 $2,030
UD1111 #05 Y:2025 Meter recycled water (to reduce sewer charges) $1,836 $2,500
UD1111 #04 Y:2025 Install occupancy sensors $621 $782
UD1111 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $10,758 $10,506
UD1111 #02 Y:2025 Utilize energy-efficient belts and other improved mechanisms $216 -
UD1111 #01 Y:2025 Use flow control valves on equipment to optimize water use $38,544 $2,352
UD0699 #10 Y:2004 Utilize higher efficiency lamps and/or ballasts $276 $890
UD0699 #09 Y:2004 Utilize energy-efficient belts and other improved mechanisms $775 -
UD0699 #08 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $975 $255
UD0699 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $3,162 $8,406
UD0699 #06 Y:2004 Reduce the pressure of compressed air to the minimum required $3,689 -
UD0699 #05 Y:2004 Disconnect ballasts $7,031 $377
UD0699 #04 Y:2004 Install outside air damper / economizer on hvac unit $18,114 -
UD0699 #03 Y:2004 Replace fossil fuel equipment with electrical equipment $297,217 -
UD0699 #02 Y:2004 Re-use or recycle hot or cold process exhaust air $85,223 $13,240
UD0699 #01 Y:2004 Add equipment/ operators to reduce production bottleneck $96,000 $204,300