36
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Cookies and crackers | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0493 #08 Y:2016 | 08 | 2016 | Install compressor air intakes in coolest locations | $188 | $500 |
n/a
|
| BD0493 #07 Y:2016 | 07 | 2016 | Install occupancy sensors | $925 | $1,050 |
n/a
|
| BD0493 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $932 | $20 |
n/a
|
| BD0493 #05 Y:2016 | 05 | 2016 | Recharge batteries on during off-peak demand periods | $2,280 | $50 |
n/a
|
| BD0493 #04 Y:2016 | 04 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,605 | $600 |
n/a
|
| BD0493 #03 Y:2016 | 03 | 2016 | Analyze flue gas for proper air/fuel ratio | $3,620 | $6,000 |
n/a
|
| BD0493 #02 Y:2016 | 02 | 2016 | Replace boiler | $7,259 | $14,000 |
n/a
|
| BD0493 #01 Y:2016 | 01 | 2016 | Use radiant heater for spot heating | $17,520 | $1,900 |
n/a
|
| BD0464 #09 Y:2015 | 09 | 2015 | Shut off pilots in standby equipment | $590 | $40 | |
| BD0464 #08 Y:2015 | 08 | 2015 | Utilize higher efficiency lamps and/or ballasts | $996 | $700 | |
| BD0464 #07 Y:2015 | 07 | 2015 | Install compressor air intakes in coolest locations | $1,313 | $750 | |
| BD0464 #06 Y:2015 | 06 | 2015 | Use most efficient type of electric motors | $2,364 | $2,900 | |
| BD0464 #05 Y:2015 | 05 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $3,866 | $20 | |
| BD0464 #04 Y:2015 | 04 | 2015 | Install occupancy sensors | $6,685 | $3,075 | |
| BD0464 #03 Y:2015 | 03 | 2015 | Replace obsolete burners with more efficient ones | $9,022 | $30,000 | |
| BD0464 #02 Y:2015 | 02 | 2015 | Use / purchase optimum sized compressor | $11,746 | $20,000 | |
| BD0464 #01 Y:2015 | 01 | 2015 | Preheat combustion air with waste heat | $12,126 | $18,000 | |
| BD0424 #10 Y:2013 | 10 | 2013 | Use photocell controls | $374 | $435 | |
| BD0424 #09 Y:2013 | 09 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,163 | $1,660 | |
| BD0424 #08 Y:2013 | 08 | 2013 | Install turbulators | $3,136 | $3,000 |