Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cookies and crackers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0493 #08 Y:2016 Install compressor air intakes in coolest locations $188 $500
BD0493 #07 Y:2016 Install occupancy sensors $925 $1,050
BD0493 #06 Y:2016 Reduce the pressure of compressed air to the minimum required $932 $20
BD0493 #05 Y:2016 Recharge batteries on during off-peak demand periods $2,280 $50
BD0493 #04 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $2,605 $600
BD0493 #03 Y:2016 Analyze flue gas for proper air/fuel ratio $3,620 $6,000
BD0493 #02 Y:2016 Replace boiler $7,259 $14,000
BD0493 #01 Y:2016 Use radiant heater for spot heating $17,520 $1,900
BD0464 #09 Y:2015 Shut off pilots in standby equipment $590 $40
BD0464 #08 Y:2015 Utilize higher efficiency lamps and/or ballasts $996 $700
BD0464 #07 Y:2015 Install compressor air intakes in coolest locations $1,313 $750
BD0464 #06 Y:2015 Use most efficient type of electric motors $2,364 $2,900
BD0464 #05 Y:2015 Reschedule plant operations or reduce load to avoid peaks $3,866 $20
BD0464 #04 Y:2015 Install occupancy sensors $6,685 $3,075
BD0464 #03 Y:2015 Replace obsolete burners with more efficient ones $9,022 $30,000
BD0464 #02 Y:2015 Use / purchase optimum sized compressor $11,746 $20,000
BD0464 #01 Y:2015 Preheat combustion air with waste heat $12,126 $18,000
BD0424 #10 Y:2013 Use photocell controls $374 $435
BD0424 #09 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,163 $1,660
BD0424 #08 Y:2013 Install turbulators $3,136 $3,000