ITAC Assessment: UD1111
ITAC logo
ITAC Assessment: UD1111
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cookies, etc
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 298
Plant Area 86,000
ft2
Annual Production 79,070,834
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,511 3,370,430
kWh
Electricity Demand $92,145 6,993
kW-mo/yr
Electricity Fees $7,000 -
Natural Gas $67,753 9,365
MMBtu
Waste Disposal Costs
Water Usage $23,763 5,492
Tgal
Water Disposal $51,181 5,492
Tgal
TOTAL YEARLY COSTS $501,353
RECOMMENDED SAVINGS* $54,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $216 - $175
2,273
kWh
$41
-
kW-mo/yr
- - - -
02 3.4156: Use flow control valves on equipment to optimize water use $38,544 $2,352 $8,971
116,509
kWh
- $9,381
-
Tgal
$20,192
-
Tgal
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,758 $10,506 $6,604
85,766
kWh
$1,698
-
kW-mo/yr
- - $1,978 $478
04 2.7135: Install occupancy sensors $621 $782 $296
3,838
kWh
$283
-
kW-mo/yr
- - $30 $12
05 3.4116: Meter recycled water (to reduce sewer charges) $1,836 $2,500 - - - $1,836
-
Tgal
- -
06 2.4221: Install compressor air intakes in coolest locations $1,406 $2,030 $1,137
14,761
kWh
$269
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $690 $953 $559
7,261
kWh
$131
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $54,071 $19,123 $17,742
230,408
kWh
$2,422
-
kW-mo/yr
$9,381
-
Tgal
$22,028
-
Tgal
$2,008 $490
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs