ITAC Assessment: GT0636
ITAC logo
ITAC Assessment: GT0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Kayaks
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 125,000
ft2
Annual Production 27,500
pieces
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,221 2,074,150
kWh
Electricity Demand $18,116 3,150
kW-mo/yr
Electricity Fees $6,920 -
Natural Gas $158,783 29,356
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $904,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Product Savings
01 2.8113: Purchase gas directly from a contract gas supplier $49,000 - - - - $49,000 -
02 2.8114: Change rate schedules or other changes in utility service $8,227 - - - - $8,227 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,388 $150 $5,767
144,197
kWh
$621
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,129 $4,740 $702
17,878
kWh
$366
-
kW-mo/yr
$61 - -
05 2.7111: Reduce illumination to minimum necessary levels $6,095 - $5,750
71,805
kWh
- $345 - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,075 - - - - $6,075 -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,950 $6,500 - - - $2,950 -
08 4.111: Add equipment/ operators to reduce production bottleneck $825,000 - - - - - $825,000
TOTAL RECOMMENDED $904,864 $11,390 $12,219
233,880
kWh
$987
-
kW-mo/yr
$406 $66,252 $825,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs