ITAC Assessment: IC0302
ITAC logo
ITAC Assessment: IC0302
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Toasts and pastries, breakfast bars (fruit and grain bars), gluten free crackers
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 500,000
ft2
Annual Production 7,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,676 6,685,230
kWh
Electricity Demand $114,241 13,596
kW-mo/yr
Electricity Fees $164,650 -
Natural Gas $211,336 63,188
MMBtu
Waste Disposal Costs
Water Usage $70,795 4,720
Tgal
TOTAL YEARLY COSTS $721,699
RECOMMENDED SAVINGS* $25,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,001 $2,566 $1,940
80,834
kWh
$1,061
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $215 $1,256 $131
5,454
kWh
$84
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $411 - $266
11,073
kWh
$145
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $376 - $292
12,166
kWh
$84
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,613 - $893
37,190
kWh
$721
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $2,025 $350 $157
6,526
kWh
$1,869
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $320 - $133
5,550
kWh
$186
-
kW-mo/yr
-
08 2.2511: Insulate bare equipment $1,385 $1,118 - - $1,385
-
MMBtu
09 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $2,215 $4,414 - - $2,215
-
MMBtu
10 2.4133: Use most efficient type of electric motors $13,478 $12,801 $8,056
335,660
kWh
$5,422
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,039 $22,505 $11,867
494,452
kWh
$9,572
-
kW-mo/yr
$3,600
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs