Assessment Year | 2024 |
---|---|
Principal Product | Toasts and pastries, breakfast bars (fruit and grain bars), gluten free crackers |
NAICS | 311821: Cookie and Cracker Manufacturing |
SIC | 2052: Cookies and Crackers |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
500,000
ft2
|
Annual Production | 7,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $160,676 | 6,685,230 |
kWh
|
$0.024 | |
Electricity Demand | $114,241 | 13,596 |
kW-mo/yr
|
$8.40 | |
Electricity Fees | $164,650 | - |
|
- | |
Natural Gas | $211,336 | 63,188 |
MMBtu
|
$3.34 | |
Waste Disposal Costs | |||||
Water Usage | $70,795 | 4,720 |
Tgal
|
$15.00 | |
TOTAL YEARLY COSTS | $721,699 | ||||
RECOMMENDED SAVINGS* | $25,039 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,001 | $2,566 |
$1,940
80,834
kWh
|
$1,061
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $215 | $1,256 |
$131
5,454
kWh
|
$84
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $411 | - |
$266
11,073
kWh
|
$145
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $376 | - |
$292
12,166
kWh
|
$84
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,613 | - |
$893
37,190
kWh
|
$721
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,025 | $350 |
$157
6,526
kWh
|
$1,869
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $320 | - |
$133
5,550
kWh
|
$186
-
kW-mo/yr
|
- | |
08 | 2.2511: Insulate bare equipment | $1,385 | $1,118 | - | - |
$1,385
-
MMBtu
|
|
09 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $2,215 | $4,414 | - | - |
$2,215
-
MMBtu
|
|
10 | 2.4133: Use most efficient type of electric motors | $13,478 | $12,801 |
$8,056
335,660
kWh
|
$5,422
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $25,039 | $22,505 |
$11,867
494,452
kWh
|
$9,572
-
kW-mo/yr
|
$3,600
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs