80
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Bread and other bakery products, except cookies and crackers | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0315 #07 Y:1997 | 07 | 1997 | Optimize plant power factor | $674 | $3,200 | |
| OR0315 #06 Y:1997 | 06 | 1997 | Turn off equipment when not in use | $2,120 | - | |
| OR0315 #05 Y:1997 | 05 | 1997 | Use most efficient type of electric motors | $2,591 | $4,176 | |
| OR0315 #04 Y:1997 | 04 | 1997 | Install compressor air intakes in coolest locations | $3,040 | $2,700 | |
| OR0315 #03 Y:1997 | 03 | 1997 | Reduce the pressure of compressed air to the minimum required | $934 | - | |
| OR0315 #02 Y:1997 | 02 | 1997 | Eliminate leaks in inert gas and compressed air lines/ valves | $964 | $1,000 | |
| OR0315 #01 Y:1997 | 01 | 1997 | Upgrade controls on compressors | $6,113 | $4,480 | |
| SF0134 #11 Y:1997 | 11 | 1997 | Reduce defects by reducing product tipping | $17,498 | $1,140 | |
| SF0134 #10 Y:1997 | 10 | 1997 | Meter waste water | $5,934 | $4,500 | |
| SF0134 #09 Y:1997 | 09 | 1997 | Lease / purchase baler; sell cardboard to recycler | $2,634 | $250 | |
| SF0134 #08 Y:1997 | 08 | 1997 | Increase amount of waste recovered for resale | $2,339 | $250 | |
| SF0134 #07 Y:1997 | 07 | 1997 | Use heat from boiler blowdown to preheat boiler feed water | $3,216 | $8,500 | |
| SF0134 #06 Y:1997 | 06 | 1997 | Utilize higher efficiency lamps and/or ballasts | $27,458 | $71,304 | |
| SF0134 #05 Y:1997 | 05 | 1997 | Eliminate or reduce compressed air usage | $14,457 | $30,000 | |
| SF0134 #04 Y:1997 | 04 | 1997 | Use most efficient type of electric motors | $3,279 | $2,814 | |
| SF0134 #03 Y:1997 | 03 | 1997 | Utilize controls to operate equipment only when needed | $622 | $390 | |
| SF0134 #02 Y:1997 | 02 | 1997 | Reduce the pressure of compressed air to the minimum required | $5,690 | $1,675 | |
| SF0134 #01 Y:1997 | 01 | 1997 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,778 | - | |
| OK0536 #08 Y:1997 | 08 | 1997 | Contract a wood pallet recycling company | $1,650 | - | |
| OK0536 #07 Y:1997 | 07 | 1997 | Use less wasteful packaging | $4,440 | - |