Assessment Year | 1998 |
---|---|
Principal Product | Baked Goods |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
85,000
ft2
|
Annual Production | 55,000,000
lb
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $390,828 | 8,047,480 |
kWh
|
$0.049 |
Electricity Demand | $202,630 | 16,036 |
kW-mo/yr
|
$12.64 |
Natural Gas | $228,684 | 61,083 |
MMBtu
|
$3.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,905 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,647 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,778 | - |
$1,004
20,809
kWh
|
$774
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,690 | $1,675 |
$3,769
77,667
kWh
|
$1,921
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $622 | $390 |
$396
8,206
kWh
|
$226
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $3,279 | $2,814 |
$2,058
42,497
kWh
|
$1,221
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $14,457 | $30,000 |
$13,335
274,619
kWh
|
$1,122
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $27,458 | $71,304 |
$19,389
399,179
kWh
|
$8,069
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $3,216 | $8,500 | - | - |
$3,216
-
MMBtu
|
- | - | - | - | |
08 | 3.5313: Increase amount of waste recovered for resale | $2,339 | $250 | - | - | - | - |
$2,339
-
lb
|
- | - | |
09 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,634 | $250 | - | - | - | - |
$2,634
-
lb
|
- | - | |
10 | 3.4155: Meter waste water | $5,934 | $4,500 | - | - | - |
$5,934
-
Tgal
|
- | - | - | |
11 | 4.123: Reduce defects by reducing product tipping | $17,498 | $1,140 | - | - | - | - | - | $4,498 | $13,000 | |
TOTAL RECOMMENDED | $84,905 | $120,823 |
$39,951
822,977
kWh
|
$13,333
-
kW-mo/yr
|
$3,216
-
MMBtu
|
$5,934
-
Tgal
|
$4,973
-
lb
|
$4,498 | $13,000 | ||
TOTAL IMPLEMENTED | $70,647 | $114,398 |
$36,182
745,310
kWh
|
$11,412
-
kW-mo/yr
|
$3,216
-
MMBtu
|
- |
$2,339
-
lb
|
$4,498 | $13,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs