ITAC Assessment: SF0134
ITAC logo
ITAC Assessment: SF0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Baked Goods
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 85,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 5,460
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,828 8,047,480
kWh
Electricity Demand $202,630 16,036
kW-mo/yr
Natural Gas $228,684 61,083
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,778 - $1,004
20,809
kWh
$774
-
kW-mo/yr
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,690 $1,675 $3,769
77,667
kWh
$1,921
-
kW-mo/yr
- - - - -
03 2.6231: Utilize controls to operate equipment only when needed $622 $390 $396
8,206
kWh
$226
-
kW-mo/yr
- - - - -
04 2.4133: Use most efficient type of electric motors $3,279 $2,814 $2,058
42,497
kWh
$1,221
-
kW-mo/yr
- - - - -
05 2.4239: Eliminate or reduce compressed air usage $14,457 $30,000 $13,335
274,619
kWh
$1,122
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $27,458 $71,304 $19,389
399,179
kWh
$8,069
-
kW-mo/yr
- - - - -
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $3,216 $8,500 - - $3,216
-
MMBtu
- - - -
08 3.5313: Increase amount of waste recovered for resale $2,339 $250 - - - - $2,339
-
lb
- -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $2,634 $250 - - - - $2,634
-
lb
- -
10 3.4155: Meter waste water $5,934 $4,500 - - - $5,934
-
Tgal
- - -
11 4.123: Reduce defects by reducing product tipping $17,498 $1,140 - - - - - $4,498 $13,000
TOTAL RECOMMENDED $84,905 $120,823 $39,951
822,977
kWh
$13,333
-
kW-mo/yr
$3,216
-
MMBtu
$5,934
-
Tgal
$4,973
-
lb
$4,498 $13,000
TOTAL IMPLEMENTED $70,647 $114,398 $36,182
745,310
kWh
$11,412
-
kW-mo/yr
$3,216
-
MMBtu
- $2,339
-
lb
$4,498 $13,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs