Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cereal breakfast foods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0469 #07 Y:2025 Replace existing hvac unit with high efficiency model $10,559 $51,800
MI0469 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $472 $921
MI0469 #05 Y:2025 Install occupancy sensors $1,529 $2,467
MI0469 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $35,688 $4,960
MI0469 #03 Y:2025 Lower temperature during the winter season and vice-versa $4,683 $240
MI0469 #02 Y:2025 Use solar heat to make electricty $37,130 $1,840
MI0469 #01 Y:2025 Change rate schedules or other changes in utility service $3,072 $104
DL0230 #07 Y:2023 Utilize controls to operate equipment only when needed $3,919 $2,200
DL0230 #06 Y:2023 Use hot process fluids to preheat incoming process fluids $15,141 $10,000
DL0230 #05 Y:2023 Utilize controls to operate equipment only when needed $11,418 -
DL0230 #04 Y:2023 Recover waste heat from equipment $3,146 $2,040
DL0230 #03 Y:2023 Upgrade controls on compressors $100,915 $74,000
DL0230 #02 Y:2023 Install desiccant humidity control system $44,058 $22,437
DL0230 #01 Y:2023 Upgrade controls on compressors $13,779 $15,504
CI0023 #09 Y:2023 Replace existing equipment with more suitable substitutes $2,250 $13,000
CI0023 #08 Y:2023 Recover waste heat from equipment $3,797 $5,000
CI0023 #07 Y:2023 Recharge batteries on during off-peak demand periods $5,670 $7,500
CI0023 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,881 $2,299
CI0023 #05 Y:2023 Install occupancy sensors $7,791 $2,625
CI0023 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,902 $300