SIC | Cereal breakfast foods | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IC0220 #06 Y:2019 | 06 | 2019 | Minimize water usage | $9,210 | $11,980 | |
IC0220 #05 Y:2019 | 05 | 2019 | Utilize controls to operate equipment only when needed | $274 | $250 | |
IC0220 #04 Y:2019 | 04 | 2019 | Use flow control valves on equipment to optimize water use | $37,319 | $5,747 | |
IC0220 #03 Y:2019 | 03 | 2019 | Repair or replace steam traps | $17,321 | $4,875 | |
IC0220 #02 Y:2019 | 02 | 2019 | Maintain machines to reduce leaks | $8,888 | $5,750 | |
IC0220 #01 Y:2019 | 01 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $75,268 | $7,000 | |
BD0448 #15 Y:2014 | 15 | 2014 | Replace existing equipment with more suitable substitutes | $10,650 | $30,000 | |
BD0448 #14 Y:2014 | 14 | 2014 | Replace city water with recycled water via cooling tower | $61,924 | $25,000 | |
BD0448 #13 Y:2014 | 13 | 2014 | Utilize higher efficiency lamps and/or ballasts | $668 | $600 | |
BD0448 #12 Y:2014 | 12 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $1,070 | $40 | |
BD0448 #11 Y:2014 | 11 | 2014 | Recharge batteries on during off-peak demand periods | $2,517 | $45 | |
BD0448 #10 Y:2014 | 10 | 2014 | Reduce the pressure of compressed air to the minimum required | $2,621 | $120 | |
BD0448 #09 Y:2014 | 09 | 2014 | Install compressor air intakes in coolest locations | $2,990 | $1,000 | |
BD0448 #08 Y:2014 | 08 | 2014 | Use waste heat from hot flue gases to preheat | $3,695 | $3,000 | |
BD0448 #07 Y:2014 | 07 | 2014 | Install occupancy sensors | $3,869 | $1,625 | |
BD0448 #06 Y:2014 | 06 | 2014 | Replace obsolete burners with more efficient ones | $13,135 | $30,000 | |
BD0448 #05 Y:2014 | 05 | 2014 | Use most efficient type of electric motors | $13,680 | $9,880 | |
BD0448 #04 Y:2014 | 04 | 2014 | Analyze flue gas for proper air/fuel ratio | $14,011 | $10,000 | |
BD0448 #03 Y:2014 | 03 | 2014 | Utilize higher efficiency lamps and/or ballasts | $14,582 | $17,750 | |
BD0448 #02 Y:2014 | 02 | 2014 | Install turbulators | $18,699 | $5,000 |