Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cereal breakfast foods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0220 #06 Y:2019 Minimize water usage $9,210 $11,980
IC0220 #05 Y:2019 Utilize controls to operate equipment only when needed $274 $250
IC0220 #04 Y:2019 Use flow control valves on equipment to optimize water use $37,319 $5,747
IC0220 #03 Y:2019 Repair or replace steam traps $17,321 $4,875
IC0220 #02 Y:2019 Maintain machines to reduce leaks $8,888 $5,750
IC0220 #01 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $75,268 $7,000
BD0448 #15 Y:2014 Replace existing equipment with more suitable substitutes $10,650 $30,000
BD0448 #14 Y:2014 Replace city water with recycled water via cooling tower $61,924 $25,000
BD0448 #13 Y:2014 Utilize higher efficiency lamps and/or ballasts $668 $600
BD0448 #12 Y:2014 Reschedule plant operations or reduce load to avoid peaks $1,070 $40
BD0448 #11 Y:2014 Recharge batteries on during off-peak demand periods $2,517 $45
BD0448 #10 Y:2014 Reduce the pressure of compressed air to the minimum required $2,621 $120
BD0448 #09 Y:2014 Install compressor air intakes in coolest locations $2,990 $1,000
BD0448 #08 Y:2014 Use waste heat from hot flue gases to preheat $3,695 $3,000
BD0448 #07 Y:2014 Install occupancy sensors $3,869 $1,625
BD0448 #06 Y:2014 Replace obsolete burners with more efficient ones $13,135 $30,000
BD0448 #05 Y:2014 Use most efficient type of electric motors $13,680 $9,880
BD0448 #04 Y:2014 Analyze flue gas for proper air/fuel ratio $14,011 $10,000
BD0448 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $14,582 $17,750
BD0448 #02 Y:2014 Install turbulators $18,699 $5,000