ITAC Assessment: CI0023
ITAC logo
ITAC Assessment: CI0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Grain Based Breakfast Cereals
NAICS 311230: Breakfast Cereal Manufacturing
SIC 2043: Cereal Breakfast Foods
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 200,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,344 1,517,486
kWh
Electricity Demand $31,474 4,662
kW-mo/yr
Electricity Fees $118,730 -
Natural Gas $115,991 11,599
MMBtu
Waste Disposal Costs
Water Usage $9,428 5,830
Tgal
Water Disposal $1,269 5,830
Tgal
TOTAL YEARLY COSTS $487,236
RECOMMENDED SAVINGS* $171,403 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings
01 2.9114: Use solar heat to make electricty $78,738 $658,288 $72,614
523,908
kWh
$6,124
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $45,480 $17,533 - - $45,480
-
MMBtu
-
03 2.1224: Replace boiler $13,894 $30,000 $(-29,059.0)
(-209,664)
kWh
$(-545.0)
-
kW-mo/yr
$43,498
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,902 $300 $7,226
52,136
kWh
$676
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $7,791 $2,625 $7,539
54,395
kWh
$252
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,881 $2,299 $5,424
39,137
kWh
$457
-
kW-mo/yr
- -
07 2.3132: Recharge batteries on during off-peak demand periods $5,670 $7,500 - $5,670
-
kW-mo/yr
- -
08 2.2437: Recover waste heat from equipment $3,797 $5,000 $2,177
15,709
kWh
$1,620
-
kW-mo/yr
- -
09 4.652: Replace existing equipment with more suitable substitutes $2,250 $13,000 - - - $2,250
TOTAL RECOMMENDED $171,403 $736,545 $65,921
475,621
kWh
$14,254
-
kW-mo/yr
$88,978
-
MMBtu
$2,250
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Increase in Production Savings