ITAC Assessment: UF0095
ITAC logo
ITAC Assessment: UF0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Packaging Machinery
NAICS
n/a
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 130,000
ft2
Annual Production 85
pieces
Production Hrs. Annual 4,121
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,360 2,006,448
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,757

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,948 $39,507 $32,948
445,193
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,388 $1,750 $1,388
18,757
kWh
03 2.7232: Replace existing hvac unit with high efficiency model $16,867 $24,660 $16,867
228,019
kWh
04 2.2621: Modify refrigeration system to operate at a lower pressure $6,763 $22,550 $6,763
91,442
kWh
05 2.7271: Replace electric reheat with heat pipes $11,259 $38,450 $11,259
152,110
kWh
06 2.3113: Make ice during off peak hours for cooling $49,423 $76,330 $49,423
-
kWh
07 2.4133: Use most efficient type of electric motors $554 $794 $554
7,620
kWh
TOTAL RECOMMENDED $119,202 $204,041 $119,202
943,141
kWh
TOTAL IMPLEMENTED $51,757 $66,711 $51,757
699,589
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs