Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pickled fruits and vegetables, vegetable sauces and seasonings, and salad dressings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0578 #10 Y:1999 Lease / purchase baler; sell cardboard to recycler $1,140 -
UD0578 #09 Y:1999 Utilize daylight whenever possible in lieu of artificial light $1,220 $230
UD0578 #08 Y:1999 Use optimum size and capacity equipment $3,734 $13,000
UD0578 #07 Y:1999 Use filtration, centrifuging to remove contaminants $3,939 $6,750
UD0578 #06 Y:1999 Meter recycled water (to reduce sewer charges) $5,242 -
UD0578 #05 Y:1999 Use power during off-peak periods $8,867 -
UD0578 #04 Y:1999 Use hot process fluids to preheat incoming process fluids $17,671 $3,000
UD0578 #03 Y:1999 Install equipment to move product $19,500 $8,600
UD0578 #02 Y:1999 Develop standard operating procedures $26,052 -
UD0578 #01 Y:1999 Install shelves / racks to utilize unused space $323,997 $26,940
UD0450 #09 Y:1994 Utilize controls to operate equipment only when needed $2,319 -
UD0450 #08 Y:1994 Maximize production runs to reduce cleaning $24,424 -
UD0450 #07 Y:1994 Meter waste water $61,699 $2,000
UD0450 #06 Y:1994 Replace electrically-operated equipment with fossil fuel equipment $1,370 $2,500
UD0450 #05 Y:1994 Reduce illumination to minimum necessary levels $980 $250
UD0450 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $5,449 $10,000
UD0450 #03 Y:1994 Utilize controls to operate equipment only when needed $6,103 $2,000
UD0450 #02 Y:1994 Recover waste heat from equipment $4,096 $2,000
UD0450 #01 Y:1994 Turn off equipment during breaks, reduce operating time $9,163 -
UD0127 #04 Y:1984 Use most efficient type of electric motors $79 $83