210
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Dried and dehydrated fruits, vegetables, and soup mixes | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0826 #05 Y:2026 | 05 | 2026 | Install common header on compressors | $3,389 | $17,947 |
n/a
|
| OR0826 #04 Y:2026 | 04 | 2026 | Use heat from boiler blowdown to preheat boiler feed water | $1,494 | $6,047 |
n/a
|
| OR0826 #03 Y:2026 | 03 | 2026 | Optimize plant power factor | $13,756 | $35,271 |
n/a
|
| OR0826 #02 Y:2026 | 02 | 2026 | Insulate bare equipment | $3,164 | $698 |
n/a
|
| OR0826 #01 Y:2026 | 01 | 2026 | Pay utility bills on time | $3,568 | - |
n/a
|
| UU0285 #10 Y:2025 | 10 | 2025 | Install occupancy sensors | $3,820 | $17,670 | |
| UU0285 #09 Y:2025 | 09 | 2025 | Utilize higher efficiency lamps and/or ballasts | $8,110 | $41,570 | |
| UU0285 #08 Y:2025 | 08 | 2025 | Pay bills on time to avoid late fees | $694 | $720 | |
| UU0285 #07 Y:2025 | 07 | 2025 | Reduce fluid flow rates | $2,210 | $30,850 | |
| UU0285 #06 Y:2025 | 06 | 2025 | Eliminate or reduce compressed air usage | $2,160 | $1,440 | |
| UU0285 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,700 | $2,950 | |
| UU0285 #04 Y:2025 | 04 | 2025 | Install common header on compressors | $23,800 | $394,000 | |
| UU0285 #03 Y:2025 | 03 | 2025 | Use optimum size and capacity equipment | $1,950 | $24,760 | |
| UU0285 #02 Y:2025 | 02 | 2025 | Eliminate or reduce compressed air usage | $1,860 | $600 | |
| UU0285 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $31,860 | $229,725 | |
| UU0264 #11 Y:2024 | 11 | 2024 | Replace fossil fuel equipment with electrical equipment | $44,506 | $432,000 | |
| UU0264 #10 Y:2024 | 10 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $515 | $916 | |
| UU0264 #09 Y:2024 | 09 | 2024 | Use solar heat to make electricty | $44,517 | $717,537 | |
| UU0264 #08 Y:2024 | 08 | 2024 | Install occupancy sensors | $538 | $1,531 | |
| UU0264 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $4,405 | $8,915 |