ITAC Assessment: UU0264
ITAC logo
ITAC Assessment: UU0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product mashed potatoes, dehydrated potatoes, hash browns, and other flavored potato products
NAICS 311423: Dried and Dehydrated Food Manufacturing
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 350,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 7,680
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $990,583 17,755,813
kWh
Electricity Demand $330,810 25,738
kW-mo/yr
Electricity Fees $41,473 -
Natural Gas $4,144,422 750,434
MMBtu
LPG $83,132 4,169
MMBtu
TOTAL YEARLY COSTS $5,590,420
RECOMMENDED SAVINGS* $1,503,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 4.443: Install automatic boiler fuel feed system $79,422 $143,652 - - $79,422
-
MMBtu
- -
02 2.2441: Preheat boiler makeup water with waste process heat $215,672 $730,950 - - $215,672
-
MMBtu
- -
03 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $729,671 $3,645,455 $1,295,464
16,868,021
kWh
- $(-395,905.0)
-
MMBtu
- $(-169,888.0)
04 2.1224: Replace boiler $379,077 $4,080,441 - - $379,077
-
MMBtu
- -
05 2.4224: Upgrade controls on compressors $3,332 $4,000 $2,823
50,602
kWh
$509
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $1,905 $7,317 $1,905
34,152
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,405 $8,915 $3,032
54,346
kWh
$1,373
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $538 $1,531 $405
7,253
kWh
$133
-
kW-mo/yr
- - -
09 2.9114: Use solar heat to make electricty $44,517 $717,537 $44,159
791,540
kWh
$358
-
kW-mo/yr
- - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $515 $916 $515
9,227
kWh
- - - -
11 2.1321: Replace fossil fuel equipment with electrical equipment $44,506 $432,000 $(-32,734.2)
(-586,752)
kWh
$(-5,891.8)
-
kW-mo/yr
- $83,132
-
MMBtu
-
TOTAL RECOMMENDED $1,503,560 $9,772,714 $1,315,569
17,228,389
kWh
$(-3,519.3)
-
kW-mo/yr
$278,266
-
MMBtu
$83,132
-
MMBtu
$(-169,888.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Administrative Changes Savings