| Assessment Year | 2014 |
|---|---|
| Principal Product | Processed laundry |
| NAICS | 812332: Industrial Launderers |
| SIC | 7218: Industrial Launderers |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
80,000
ft2
|
| Annual Production | 11,600,000
lb
|
| Production Hrs. Annual | 3,900
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $189,673 | 1,757,100 |
kWh
|
$0.11 |
| Electricity Demand | $61,550 | 5,273 |
kW-mo/yr
|
$11.67 |
| Electricity Fees | $24,626 | - |
|
- |
| Natural Gas | $245,039 | 30,045 |
MMBtu
|
$8.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,882 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,703 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $18,229 | $5,000 | - | - |
$18,229
-
Tgal
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,618 | $4,285 |
$4,618
42,802
kWh
|
- | - | |
| 03 | 2.7314: Reduce ventilation air | $1,607 | $4,600 |
$453
4,196
kWh
|
$1,154
-
MMBtu
|
- | |
| 04 | 2.7314: Reduce ventilation air | $524 | $1,300 |
$57
525
kWh
|
$467
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $478 | $300 |
$478
4,430
kWh
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $426 | $1,200 | - |
$426
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $25,882 | $16,685 |
$5,606
51,953
kWh
|
$2,047
-
MMBtu
|
$18,229
-
Tgal
|
||
| TOTAL IMPLEMENTED | $6,703 | $9,185 |
$5,549
51,428
kWh
|
$1,154
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs