| Assessment Year | 2025 |
|---|---|
| Principal Product | Sweet corn seeds, beans |
| NAICS | 311423: Dried and Dehydrated Food Manufacturing |
| SIC | 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
130,000
ft2
|
| Annual Production | 8,200
ton
|
| Production Hrs. Annual | 3,800
hrs
|
| Location (State) | Idaho |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,437 | 1,318,710 |
kWh
|
$0.051 |
| Electricity Demand | $67,496 | 7,342 |
kW-mo/yr
|
$9.19 |
| Electricity Fees | $17,663 | - |
|
- |
| Natural Gas | $75,780 | 13,370 |
MMBtu
|
$5.67 |
| LPG | $17,030 | 963 |
MMBtu
|
$17.68 |
| Fuel Oil #1 | $41,030 | 1,321 |
MMBtu
|
$31.06 |
| Other Gas | $70 | 1 |
MMBtu
|
$69.80 |
| TOTAL YEARLY COSTS | $286,506 | |||
| RECOMMENDED SAVINGS* | $78,164 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $31,860 | $229,725 |
$15,310
299,390
kWh
|
$16,550
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $1,860 | $600 |
$790
15,500
kWh
|
$1,070
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4323: Use optimum size and capacity equipment | $1,950 | $24,760 |
$1,950
38,000
kWh
|
- | - | - | - | |
| 04 | 2.4225: Install common header on compressors | $23,800 | $394,000 |
$(-10,950.0)
(-214,170)
kWh
|
$(-6,280.0)
-
kW-mo/yr
|
- |
$41,030
-
MMBtu
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,700 | $2,950 |
$1,700
33,000
kWh
|
- | - | - | - | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $2,160 | $1,440 |
$2,160
42,200
kWh
|
- | - | - | - | |
| 07 | 2.5123: Reduce fluid flow rates | $2,210 | $30,850 |
$1,320
25,500
kWh
|
$890
-
kW-mo/yr
|
- | - | - | |
| 08 | 4.821: Pay bills on time to avoid late fees | $694 | $720 | - | - | $624 | - |
$70
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,110 | $41,570 |
$7,090
138,610
kWh
|
$1,020
-
kW-mo/yr
|
- | - | - | |
| 10 | 2.7135: Install occupancy sensors | $3,820 | $17,670 |
$3,200
62,750
kWh
|
$620
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $78,164 | $744,285 |
$22,570
440,780
kWh
|
$13,870
-
kW-mo/yr
|
$624 |
$41,030
-
MMBtu
|
$70
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs