ITAC Assessment: UF0224
ITAC logo
ITAC Assessment: UF0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Cardboard Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 227,000
ft2
Annual Production 1,000,000,000
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $287,893 12,854,924
kWh
Electricity Demand $52,117 27,750
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,683 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,105 $1,000 $2,105
117,819
kWh
- - - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,042 $2,836 $1,042
30,188
kWh
- - - - -
03 2.3212: Optimize plant power factor $2,089 - - $2,089 - - - -
04 2.1213: Direct warmest air to combustion intake $16,001 $16,000 - - $16,001
-
MMBtu
- - -
05 3.4155: Meter waste water $6,128 $1,500 - - - $6,128
-
Tgal
- -
06 4.711: Initiate a total quality management program $50,698 $22,390 - - - - $50,698
-
lb
-
07 2.4239: Eliminate or reduce compressed air usage $6,620 $2,990 - - - - - $6,620
TOTAL RECOMMENDED $84,683 $46,716 $3,147
148,007
kWh
$2,089 $16,001
-
MMBtu
$6,128
-
Tgal
$50,698
-
lb
$6,620
TOTAL IMPLEMENTED $55,934 $26,226 $3,147
148,007
kWh
$2,089 - - $50,698
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs