Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

277

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Canned specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2406 #09 Y:2024 Use outside cold water source as a supply of cooling water $35,350 $159,350
UL2406 #08 Y:2024 Use solar heat to make electricty $78,236 $775,946
UL2406 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,544 $12,225
UL2406 #06 Y:2024 Remove or close off unneeded compressed air lines $4,470 $1,120
UL2406 #05 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $20,826 $10,980
UL2406 #04 Y:2024 Install occupancy sensors $112 $406
UL2406 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $17,721 $15,563
UL2406 #02 Y:2024 Optimize plant power factor $7,741 $12,220
UL2406 #01 Y:2024 Optimize plant power factor $21,720 $14,950
MU0037 #05 Y:2023 Increase amount of condensate returned $104,339 -
MU0037 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $6,677 $8,432
MU0037 #03 Y:2023 Insulate bare equipment $65,091 $242,014
MU0037 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $2,719 $180
MU0037 #01 Y:2023 Reduce space conditioning during non-working hours $206,493 $9,224
UU0179 #08 Y:2021 Insulate bare equipment $345 $747
UU0179 #07 Y:2021 Reschedule plant operations or reduce load to avoid peaks $617 $50
UU0179 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,013 $6,614
UU0179 #05 Y:2021 Lower temperature during the winter season and vice-versa $1,131 $100
UU0179 #04 Y:2021 Install vinyl strip / high speed / air curtain doors $1,472 $8,300
UU0179 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,891 $1,233