ITAC Assessment: UL2406
ITAC logo
ITAC Assessment: UL2406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Canned Foods
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2032: Canned Specialties
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 267,000
ft2
Annual Production 33,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,739 6,394,920
kWh
Electricity Demand $348,620 15,845
kW-mo/yr
Electricity Fees $39,864 -
Natural Gas $301,553 66,552
MMBtu
Waste Disposal Costs
Water Usage $271,417 56,678
Tgal
TOTAL YEARLY COSTS $1,168,193
RECOMMENDED SAVINGS* $189,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
01 2.3212: Optimize plant power factor $21,720 $14,950 - - $21,720 -
02 2.3212: Optimize plant power factor $7,741 $12,220 - - $7,741 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $17,721 $15,563 $6,783
209,994
kWh
$10,938
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $112 $406 $112
3,469
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,826 $10,980 $20,826
650,799
kWh
- - -
06 2.4235: Remove or close off unneeded compressed air lines $4,470 $1,120 $2,299
71,855
kWh
$2,171
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,544 $12,225 $3,544
110,761
kWh
- - -
08 2.9114: Use solar heat to make electricty $78,236 $775,946 $33,945
1,060,797
kWh
$44,291
-
kW-mo/yr
- -
09 2.2692: Use outside cold water source as a supply of cooling water $35,350 $159,350 $638
19,748
kWh
$23,636
-
kW-mo/yr
- $11,076
-
Tgal
TOTAL RECOMMENDED $189,720 $1,002,760 $68,147
2,127,423
kWh
$81,036
-
kW-mo/yr
$29,461 $11,076
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs